Similar Projects
Camp Verde Sports Complex Phase I-B
Results
Camp Verde, AZ

Talking Stick Resort Arena
Renovation
Construction
Less than $234,900,000 est. value
Phoenix, AZ 85004

Demolition and New Construction of Chandler High Weight Room
New Construction, Demolition
Results
Less than $2,139,450 est. value
Chandler, AZ 85224

Construction Manager at Risk for Alhambra Phase 2A Gymnasiums
Results
Less than $13,685,068 est. value
Phoenix, AZ

CMAR for Region 1 Auditorium and Outdoor Athletic Facility Modernizations
Term Contract
Results
$19,000,000 to $20,000,000 est. value
Phoenix, AZ 85012

CMAR for Region 2 Auditorium and Outdoor Athletic Facility Modernizations
Renovation
Results
$19,000,000 to $20,000,000 est. value
Phoenix, AZ 85009

CMAR for Region 4 Auditorium and Outdoor Athletic Facility Modernizations
Renovation
Results
$7,000,000 to $8,000,000 est. value
Phoenix, AZ 85012

CMAR for Region 3 Auditorium and Outdoor Athletic Facility Modernizations
Renovation
Results
$16,000,000 to $17,000,000 est. value
Laveen, AZ 85339

Construction Manager at Risk North Center Street Sports Complex
Results
$6,500,000 est. value
Mesa, AZ 85211

Sky Zone Trampoline Park #1928
Renovation - 22,403 SF
Construction
$285,126 est. value
Phoenix, AZ 85013

Longevity Athletics
Renovation - 2,721 SF
Construction
Maricopa, AZ 85138

Legacy Sports Park
New Construction - 83,000 SF
Construction
$2,500,000 est. value
Mesa, AZ 85212

Running Tracks
Post-Bid
Kingman, AZ

Reported 09/02/2020 10:03 AM
Project Title

Grinder Sports

Physical Address View project details and contacts
City, State (County) Florence, AZ   (Pinal County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

15 collegiate baseball fields, 1 professional baseball stadium, 15 collegiate softball fields, 1 professional softball field, 14 multi-purpose fields, track and field center, aquatics venue, 10 tennis courts with a stadium, pickle ball courts, 10 basketball courts, 20 volleyball courts, and a field house

Details

Athletic Facility, New Construction, 357 Acres.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Specialty Flooring, Synthetic Turf Flooring, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Gymnasium Equipment, Interior Tennis Equipment, Interior Scoreboards, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Tennis Equipment, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Athletic Surfacing, Field Sport Surfacing, Natural Field Sport Surfacing, Synthetic Field Sport Surfacing, Tennis Court Surfacing, Natural Tennis Court Surfacing, Synthetic Tennis Court Surfacing, Fences and Gates, Chain Link Fences and Gates, Tennis Court Fences and Gates, Tennis Court Wind Breaker, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents