Similar Projects
King Philip Street Apartments
Renovation - 9,630 SF
Conception
Fall River, MA 02721

Third Street Duplex
Renovation - 3,542 SF
Conception
Fall River, MA 02721

Eighteen and Union Apartments, Restaurant, and Retail
New Construction
Design
New Bedford, MA

Residences at River Edge
New Construction - 33,239 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fall River, MA 02720

Disposition of City-Owned Property - 135 County Street & 0 Cora Street
New Construction, Renovation
Results
Attleboro, MA 02703

Purchase and Re-Use of 60 Eighth Street
Results
New Bedford, MA 02740

Mechanics Mill Apartments
Renovation - 137,800 SF
Construction
$36,000,000 est. value
Attleboro, MA 02703

Grinnell Street Triplex
Renovation, Addition - 6,758 SF
Construction
Less than $50,000 est. value
Fall River, MA

Winthrop Street Multi Family Development
New Construction
Pending Verification
Taunton, MA

Anderson Way Apartments
New Construction - 7,645 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Dartmouth, MA

Alden Street Apartments
New Construction - 68,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Fall River, MA 02723

Adams House Redevelopment
Renovation - 23,845 SF
Design
Fall River, MA

Elevator Modernizations at Cardinal Medeiros Tower - General Bid
Results
Less than $1,300,000 est. value
Fall River, MA 02720

Brayton Avenue Triplex
Renovation, Addition
Construction
Less than $13,000 est. value
Fall River, MA

Mariano Bishop Boulevard Apartments
New Construction
Pending Verification
Fall River, MA

Reported 02/12/2021 12:00 AM
Project Title

Bathroom Upgrades

Physical Address View project details and contacts
City, State (County) Fall River, MA 02721   (Bristol County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of: Removal of existing wooden partitions and doors; removal and infilling of windows; repairs to concrete foundation cracks and spalls; repairs to plaster walls, upgrade existing lighting; new smoke/heat and carbon

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents