Similar Projects
Campus Infrastructure Support Construction - Prairie View A&M University
Infrastructure
Conception
$8,000,000 CJ est. value
Prairie View, TX 77446

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Sutong Tire / Woods Road Warehouse
New Construction - 134,000 SF
Design
$599,000 est. value
Brookshire, TX 77423

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

Public Detention Pond & 36" Storm Outfall For I-10 West Addition
Alteration
Results
TX

Mass Grading and Detention Improvements for Lakeview
Infrastructure
Results
TX

Stream Empire West
New Construction - 122,138 SF
Construction
$3,650,000 est. value
Brookshire, TX 77423

Stream Empire West
New Construction
Construction
$1,036,057 est. value
Brookshire, TX 77423

Construction of Water, Sanitary, and Drainage Facilities in Sunterra Section 31
Infrastructure
Pending Verification
$890,508 CJ est. value
Hempstead, TX 77445

Tamarron West Rec Center
New Construction, Infrastructure - 11,865 SF
Pending Verification
$2,500,000 CJ est. value
Brookshire, TX 77423

Twinwood Business Park Building 4
New Construction, Infrastructure - 181,241 SF
Design
$8,875,511 CJ est. value
Brookshire, TX 77423

Texas Heritage Parkway Section 3C
Infrastructure
Post-Bid
$3,900,000 CJ est. value
Hempstead, TX 77445

Paving and Drainage to Serve Woods Road Improvements Phase II
Alteration
Results
$5,000,000 est. value
TX

O'Reilly Auto Parts (BKS) #6256 / Brookshire
New Construction, Infrastructure - 7,650 SF
Construction
$1,300,000 CJ est. value
Brookshire, TX 77423

Last Updated 05/31/2023 03:09 PM
Project Title

Twinwood Business Park Building 2

Physical Address View project details and contacts
City, State (County) Brookshire, TX 77423   (Waller County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,880,679 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a shell building project, for a warehouse and office space. As of May 31, 2023, this project is in the process of getting approvals. An architect has been selected, and design is underway. Information regarding how and when a general contractor will be selected has not yet been confirmed. A firm timeline for construction has not been confirmed.

Details

91,288 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents