Similar Projects
Last Updated | 11/23/2021 04:19 PM |
Project Title | Middle School - University of Memphis |
Physical Address | View project details and contacts |
City, State (County) | Memphis, TN 38111 (Shelby County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. This project will involve a Change of Occupancy Classification (COC) and Existing Building Alterations to be used by University of Memphis Campus School for Middle School students. Alterations involve limited demolition and new construction on Levels 1-3. There is no architectural scope on Level 4 except for a new access control door & storefront system at existing convenience stairs. Additional scope on levels 1 thru 3 involves reworking of existing systems for new space arrangements including the following: a. Selective Demolition of existing gypsum board wall, acoustical tile ceilings, floor and wall finishes; doors and frames. b. New Construction including: 1) Gypsum Board walls to deck. 2) Acoustical tile ceilings. 3) Hollow metal doors and frames, wood doors and hardware. 4) Flooring of carpet tiles, VCT, Slate, and rubber and slate base. 5) Complete ceramic tiled toilets. 6) Cabinetry and countertops. 7) Painting and staining. 8) Maintaining the 4 story Atrium. 9) Revisions to Fire Protection System, Plumbing, HVAC and Electrical power and lighting as related to the new spaces created. 2. MPEFP scope involves a complete upgrade/ replacement of the existing Fire Alarm; replacement of the existing Fire & Jockey Pump; replacement of existing generator; testing of existing smoke evac system; limited demolition of existing electrical; limited demolition and replacement of existing light fixtures; installation of new intercom and CCTV system. 3. and other Work indicated in the Contract Documents. 4. Project will be constructed under a single prime contract. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |