Similar Projects
Elections Complex - Buncombe County
New Construction, Infrastructure
Conception
$17,751,479 CJ est. value
Asheville, NC 28805

Sulphur Springs Road Construction - City of Asheville
Infrastructure
Conception
$1,200,000 CJ est. value
Asheville, NC 28806

Woodland Development
New Construction, Infrastructure
Design
$27,000,000 CJ est. value
Asheville, NC 28806

Ingles #79 / Asheville
Addition, Demolition, New Construction, Infrastructure - 20,000 SF
Design
$10,000,000 CJ est. value
Asheville, NC 28803

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 135,355 SF
Post-Bid
$29,000,000 CJ est. value
Asheville, NC 28801

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 135,355 SF
Post-Bid
$29,000,000 CJ est. value
Asheville, NC 28801

Patching and Pavement Preservation
Infrastructure
Results
NC

Sidewalk Construction Along US-19, 23, 74A at I-40 Exit 44
Infrastructure
Results
NC

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Asheville Family Dentistry
New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Asheville, NC 28805

Garage and Warehouse Improvements - Buncombe County
Renovation, Infrastructure
Conception
$920,000 CJ est. value
Asheville, NC 28801

155 Biltmore Hotel
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Asheville, NC 28801

Reed Creek Mixed Use Development
New Construction, Infrastructure - 49,264 SF
Post-Bid
$20,000,000 CJ est. value
Asheville, NC 28801

Last Updated 06/13/2023 05:33 PM
Project Title

Sidewalks in the Shiloh Neighborhood

Physical Address View project details and contacts
City, State (County) Asheville, NC 28801   (Buncombe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Optional Site Visit: 1:00 p.m., May 18, 2023 Questions due by: 4:00 p.m., May 23, 2023 All questions that arise from the site visits must be submitted in writing prior to the deadline to submit questions. These questions will ultimately be posted with answers in an addendum no later than (7) days prior to the bid opening date. Attendance will be taken at the pre-bid meeting, and will be shared in the addendum. Attendance to the Site Visit and Pre-Bid meeting is highly encouraged but not mandatory. The City's Asheville Business Inclusion Policy and the City's Drug-Free Workplace Policy will be explained during the pre-bid meeting. The Asheville Business Inclusion Policy requires Minority and Women Business Enterprise outreach on City contracts. Additionally, N.C.G.S. 143-128.2 requires minority and women business outreach for building construction projects requiring the below provided information to be reported to the State of North Carolina Office of Historically Underutilized Businesses (HUB). The Bidder shall provide applicable ABI Documentation as described in the project manual - Asheville Business Inclusion (ABI Goals) - with their bid in order to be deemed responsive. Failure to do so will result in the Bidders bid being deemed non-responsive and disqualified.The City of Asheville reserves the right to postpone bid openings for its own convenience. In the event of inclement weather and the City Offices are closed, the bid opening will be held at 11:00 a.m. the next business day that the City Offices are open. Installation of the electrical distribution, infrastructure and site preparation to support the future installation of electric vehicle charging stations for City of Asheville Fleet vehicles at four locations: Site 1: 161 S. Charlotte Street, Asheville Site 2: 173 S. Charlotte Street, Asheville Site 3: 99999 Eagle Street, Asheville Site 4: 75 Shelburne Road, Asheville Description of Work: The Project includes proposed sidewalk along Shiloh Road, Hampton Road, and Brooklyn Road with associated Curb and Gutter along with drainage improvements for existing downspouts attached to the Shiloh Community Center building along Brooklyn Road. Additionally, the work includes the construction of ADA improvements along Brooklyn Road, Shiloh Road, and Hampton Street. Construction Start - Late August 2023 *Contractor is not required to furnish a Bid Bond, Payment Bond, or Performance Bond for this project. General Services: 14.6% MBE: Black American-owned (B), Hispanic American-Owned (H), Asian American-Owned (A), and Native American-Owned (N) Construction Services: 4.6% MBE: Black American-owned (B), Asian American-Owned (A), and Native American-Owned (N)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents