Similar Projects
Stay Open Hotel
New Construction, Renovation, Addition
Conception
San Diego, CA 92101

Pechanga Arena Redevelopment
New Construction, Renovation
Conception
San Diego, CA

The Theatre House Mixed Use Development
New Construction
Design
San Diego, CA 92101

Brown Bear Lodge & Conference Center
New Construction - 131,800 SF
Design
$10,000,000 CJ est. value
Mariposa, CA 95338

Raising Cane's #510
New Construction - 3,198 SF
Post-Bid
$400,000 to $500,000 est. value
Carson, CA 90746

Raising Cane's #474
New Construction - 3,860 SF
Post-Bid
$750,000 to $1,000,000 est. value
Barstow, CA 92311

Makers Quarter Masterplan
New Construction
Pending Verification
San Diego, CA 92101

Atari Hotel
New Construction
Pending Verification
San Jose, CA

Google Downtown West
New Construction - 684,000 SF
Conception
$10,000,000 CJ est. value
San Jose, CA 95130

601 West Beech Apartment Tower
New Construction
Design
San Diego, CA 92101

Mira Mesa Shopping Center
New Construction - 18,852 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92126

Atari Hotel
New Construction
Pending Verification
San Francisco, CA

Hollywood Center Mixed Use Development
New Construction
Conception
Los Angeles, CA 90028

Bank of Italy Building
Renovation
Design
San Jose, CA 95113

Raising Cane's #517
New Construction - 3,881 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Escondido, CA 92029

Reported 01/22/2021 12:00 AM
Project Title

Target #T0188 - Cafe Remodel

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92408   (San Bernardino County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Qualified Bidding.
Project Status Bidding by Invitation, Construction Start Expected April 2021, Construction Completion Expected April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Food/Beverage Service, 1 Story Above Grade, 904 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents