Similar Projects
Reported | 11/20/2020 12:00 AM |
Project Title | UAB West Pavilion Kitchen Piping Replacement - Phase 3 for The UAB Health System |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35249 (Jefferson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work entails the replacement of waste piping, floor sinks, and grease traps in the West Pavilion Basement kitchen of University Hospital. The scope includes saw-cutting of existing slabs, excavation, installation of new waste piping and fixtures, and repair of concrete slabs and finishes. Waste line piping replacement sizes range from 4" to 6" in diameter. The work shall be performed within the operating hospital facility using a high level of infection control measures. The Contractor shall demonstrate experience with the implementation and maintenance of infection control measures and interim life safety measures in hospital environments. The Contractor shall also demonstrate experience with performing construction in a hospital kitchen environment which had to remain operational during construction |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |