Similar Projects
2022 Bond - Proposition A - Winona Independent School District
Addition, Renovation, Infrastructure
Conception
$13,400,000 CJ est. value
Winona, TX 75792

2022 Bond - Proposition B - Winona Independent School District
Renovation, Infrastructure
Conception
$6,500,000 CJ est. value
Winona, TX 75792

Troup Highway Office Building - Shell
New Construction - 4,956 SF
Design
$500,000 est. value
Tyler, TX 75701

Spring Avenue Development
Renovation
Design
Tyler, TX 75702

RFQ Construction Manager at Risk - UT Tyler Science Building
Addition, Demolition, New Construction, Renovation, Infrastructure - 150,000 SF
Bidding
$690,000 CJ est. value
Tyler, TX 75708

Group 3 Area Pavilion Site Work At Tyler State Park
Infrastructure
Bidding
$135,000 CJ est. value
Tyler, TX 75706

2021 CDBG Sidewalk Improvements
Infrastructure
Post-Bid
Tyler, TX

Road Improvements to CR 366 and CR 369
Infrastructure
Post-Bid
$1,600,000 est. value
Tyler, TX 75702

Road Improvements to CR 292
Results
$945,000 est. value
TX 75707

2021 Asphalt Enhancement Program
Results
Tyler, TX

Southeastern Freight Lines Offices
Build-Out - 6,600 SF
Construction
Tyler, TX 75708

Murphy Oil #7068/7841 / Tyler
New Construction, Infrastructure - 1,300 SF
Construction
$2,000,000 CJ est. value
Tyler, TX 75704

The Fair / Office Development
Build-out
Pending Verification
$7,000,000 CJ est. value
Tyler, TX 75702

DK Convenience Store
New Construction, Infrastructure - 4,100 SF
Pending Verification
$2,000,000 CJ est. value
Tyler, TX 75702

Wayfare Apartments
New Construction - 374,850 SF
Design
Less than $36,559,544 est. value
Tyler, TX 75703

Last Updated 09/26/2022 12:33 PM
Project Title

Hospitality Health ER Expansion

Physical Address View project details and contacts
City, State (County) Tyler, TX 75701   (Smith County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design of a 20,000 sf warehouse building with approximately 6,000 sf of office space and associated parking and loading area As of September 26, 2022, a building permit has been issued for the parking lot; however, the building permit is under review with the City of Tyler. An architect has been selected. Information on the general contractor method of selection has not been released. A firm construction timeline has not been established.

Details

,, 26,000 SF - 20,000 SF. 6,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents