Similar Projects
Last Updated | 02/13/2020 09:23 AM |
Project Title | Construction and Engineering Inspection for the 62 Avenue Pedestrian and Bicyclist Enhancement Project |
Physical Address | View project details and contacts |
City, State (County) | South Miami, FL (Miami-Dade County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $394,452 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of Managing Construction, Engineering and performing Inspections to provide connectivity for pedestrian traffic along SW 62nd Avenue from SW 70th Street to 85th Street, as recommended in the South Miami Intermodal Transportation Plan (SMITP). Specifically, the project will provide sharrows along SW 62nd Avenue from SW 70th Street to SW 76th Street, sidewalks along both sides of SW 62nd Avenue between SW 78th Street to 80th Street, roadway reconstruction and repair of sidewalks along SW 62nd Avenue between US1 and 78th Street, and a neighborhood traffic circle at SW 62nd Avenue and SW 85th Street (Snapper Creek Drive). The sidewalk portion of the project (between 78th Street and 80th Street) will include new curb and gutters. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |