Similar Projects
Greek Housing Delta Gamma BP-02
Renovation
Bidding
Lexington, KY 40508

Student Center Dining Facilities Expansion Controls
Post-Bid
Lexington, KY

PAV WH Floors 1-3 Replace Trace on Hot Water System
Alteration
Post-Bid
Less than $165,000 est. value
Lexington, KY 40508

CEB 151 Elevated Control Room
Renovation
Results
$40,000 to $50,000 est. value
Lexington, KY 40503

Newtown Science Building Classroom Fit Up
Build-Out - 4,000 SF
Results
$472,548 est. value
Lexington, KY

UKHC Gill MRI Replacement
Renovation
Post-Bid
Lexington, KY 40508

CM Services for Delta Gamma Housing - 2555.0
Renovation, Addition
Results
$6,000,000 est. value
Lexington, KY 40508

Seaton Center Racquetball Courts
Renovation
Post-Bid
$275,000 est. value
Lexington, KY 40502

Cooper House Renew/Modernize Facilities
Renovation
Results
$2,800,000 est. value
Lexington, KY 40503

Replace Porch at Dickey Hall
Alteration
Post-Bid
Lexington, KY 40508

Leestown Building B Orthotics Lab Improvements
Renovation
Results
$282,703 est. value
Lexington, KY 40502

Renew/Modernize Frazee Hall - Bid Package 2 - All Work Categories - 2511.8
Renovation, Addition
Post-Bid
Lexington, KY 40508

UKHC PAV H Rooms H410 & H411 Pediatric Satellite
Renovation
Results
$550,000 est. value
Lexington, KY

UKHC PAV H - Replace AHU S1 and S1A - BP-02 Trades
New Construction, Infrastructure
Post-Bid
Lexington, KY 40508

Center for Robotics and Manufacturing Systems Classroom 309 Renovation
Renovation
Results
Less than $80,000 est. value
Lexington, KY 40506

Last Updated 09/07/2021 12:55 PM
Project Title

Research Building #2 Phase 4 Design Release 1 - Fit-Out

Physical Address View project details and contacts
City, State (County) Lexington, KY   (Fayette County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,517,519
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Research Building Phase 4 consists of an approximate 40,400 sf fit out of multidisciplinary research laboratory that will be the cornerstone of the University’s push to become a Top 20 national research facility. This facility is based on the latest improvements in research laboratory design standards. Bid Package #1 Trade Contracts (CCK-2521-21) shall include: Trade Contract No. Description 01A General Requirements 06A Millwork & Wood Paneling 08A Doors & Hardware 08B Interior Glass, Glazing & Metal Panels 09A Drywall, Ceilings, CFMF, & Wall Panels 09B Painting & Caulking 09C Carpet, Sheet & Resilient Flooring 09D Ceramic Tile 10A Div 10 & Accessories 10B Signage 12B Manual Shades 13A Controlled Environmental Rooms 21A Fire Protection 23A Mechanical, Plumbing, Controls & T&B 23B Controls 26A Electrical

Details

College/University, New Construction, 1 College/University, 40,400 SF Build-Out, Building.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents