Similar Projects
Last Updated | 09/02/2021 03:13 PM |
Project Title | Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan |
Physical Address | View project details and contacts |
City, State (County) | Blaine, WA 98230 (Whatcom County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Professional Services, Sewer and Water |
Sub-Category(s) | Dock/Pier/Marine, Engineering, Park/Playground, Restroom/Bath House, Sidewalks/Parking Lot, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Develop a park at the confluence of California Creek and Drayton Harbor. Approximately 30 acres of land will be protected and managed by BBBPD. Along with preservation and restoration, BBBPRD will build an interpretive trail loop, an educational kiosk, a larger pedestrian trail system, and a kayak launch to access California Creek and Drayton Harbor by boat. Wetlands will be avoided to every extent possible, and mitigation will be executed for any impacts identified. The BBBPRD is requesting proposals from qualified civil engineer firms or individuals to help develop and finalize the plans for a new trailhead and parking lot for approximately 50 cars as well as a separate two car pull-out. The parking lot will be located at 4677 Drayton Harbor Road, Blaine, which was previously a residential lot with a house, outbuildings and a driveway. The two-car pull out will be located on 4656 Drayton Harbor Road and will use the existing driveway approach. The pull-out will be used to access the kayak launch that will be located on the California Creek Estuary and will need to be large enough for two cars to park and turn around. Additional project features include a camp host site (30'x20'), public restroom (20'x30'), trails to a kiosk and from the kiosk to the kayak launch, and one or two picnic shelters. Along with finalized on-site plans, the engineer will also develop a stormwater management design and a stormwater design report. |
||||||||||||||||||||||||||
Details | Park/Playground, New Construction, Restroom/Bath House, New Construction.
|
||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |