Similar Projects
Green Valley Elementary & Valley Elementary Schools Renovation
Renovation - 112,000 SF
Conception
Jefferson, Monrovia, MD 21770

Elementary School Improvements
Renovation
Conception
Cambridge, MD 21613

Stonegate Elementary School Replacement
New Construction
Design
Less than $24,194,000 est. value
Silver Spring, MD 20905

Southern K-8 Middle School
New Construction - 233,865 SF
Design
$10,000,000 CJ est. value
Fort Washington, MD

Burnt Mills Elementary School Replacement
New Construction - 66,600 SF
Post-Bid
$10,000,000 to $15,000,000 est. value
Silver Spring, MD 20901

Thurmont Elementary School Limited Renovation Program Design Build
Renovation - 24,000 SF
Post-Bid
Less than $8,300,000 est. value
Thurmont, MD 21788

New Northeast Elementary School at Ridge Road
New Construction - 101,906 SF
Results
Less than $48,301,745 est. value
Rossville, MD 21237

Elevator Modernization at Furman L. Templeton Preparatory Academy School 125
Renovation
Results
Baltimore, MD 21217

Legacy School Expansion
New Construction, Demolition - 6,124 SF
Construction
Sykesville, MD 21784

Montebello Elementary/Middle School
Renovation, Addition - 89,500 SF
Construction
Less than $34,000,000 est. value
Baltimore, MD 21218

Dorchester County School Facilities Plan
Renovation
Conception
Cambridge, MD

Lettie Marshall Dent Elementary School Modernization
Renovation
Design
Loveville, MD

Highlandtown Elementary School Renovation and Addition
Renovation, Addition - 74,000 SF
Post-Bid
Less than $14,500,000 est. value
Baltimore, MD 21224

Relocation of One Portable Classroom Building from Piney Ridge Elementary School to Elmer Wolfe Elementary School
Results
Sykesville, Union Bridge, MD 21784

Clarksburg Cluster Elementary School #9
- 95,327 SF
Construction
$83,000,000 est. value
Clarksburg, MD 20841

Last Updated 07/12/2022 12:21 AM
Project Title

Red House Run Elementary School - Replacement School Packages 9A, 9B, and 9C

Physical Address View project details and contacts
City, State (County) Rosedale, MD 21237   (Baltimore County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,500,003 to $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education of Baltimore County invites Contractors to bid on the "Red House Run Elementary School - Replacement School - Rebid of Packages 9A, 9B, and 9C", Solicitation Number JBO-717-22 (PSCP# 03.109.22 LPC). Any inquiries regarding the specifications and/or the solicitation document shall be IN WRITING and submitted per the instructions in the solicitation document Part II Section 11.0 Inquiries During Bidding. Verbal questions will not be taken. All bidders shall be pre-qualified prior to the Bid Opening by Baltimore County Department of Public Works (BCDPW), Contracts Division as follows: 1. Package 9A - Gypsum/ACT No prequalification required 2. Package 9B - Flooring No prequalification required 3. Package 9C - Painting No prequalification required Certified Minority Business Enterprises are encouraged to respond to this solicitation notice. The contractor or supplier who provides materials, supplies, equipment and/or services for this construction project shall attempt to achieve the specific overall MBE goals per package of: 9A - Gypsum/ACT 27% 0% 0% 9B - Flooring 22% 0% 0% 9C - Painting 22% 0% 0% All prime contractors, including certified MBE firms, when submitting bids or proposals as general or prime contractors, are required to attempt to achieve this goal from certified MBE firms. The subgoals established for this project are as stated above. Any MBE firms bidding should review the provisions in COMAR 21.11.03.12-1 for counting a portion of self-performance toward meeting the stated goals. The bidder or offeror is required to submit with its bid or proposal a completed Attachment A - Certified MBE Utilization and Fair Solicitation Affidavit and Attachment B - MBE Participation Schedule, as described in the solicitation documents. This project is subject to State of Maryland Prevailing Wage Rates as determined by the Department of Labor, Licensing & Regulation - Division of Labor & Industry. See Wage Determination Section 008500 of Solicitation The Baltimore County Department of Public Works' cost group for this project are: 1. Package 9A - Gypsum/ACT Cost Group E: $2,500,001 - $5,000,000 2. Package 9B - Flooring Cost Group E: $2,500,001 - $5,000,000 3. Package 9C - Painting Cost Group C: $500,001 - $1,000,000

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents