Similar Projects
Medical College of Wisconsin Cancer Research Facility
New Construction, Infrastructure - 150,000 SF
Design
$153,000,000 CJ est. value
Wauwatosa, WI 53226

Student Union Renovation - GPC
Renovation
Results
$28,000,000 est. value
Milwaukee, WI 53211

Klotsche Center Annex - MEP
Addition
Results
Less than $5,837,000 est. value
Milwaukee, WI 53211

Marquette University College of Nursing / Straz Hall Renovation and Expansion
Addition, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Milwaukee, WI 53233

Klotsche Center Annex - General
Addition
Results
Less than $5,837,000 est. value
Milwaukee, WI 53211

Engineering and Mathematical Sciences Building Infrastructure - GPC
Renovation - 13,400 SF
Results
Less than $4,300,000 est. value
Milwaukee, WI

Engineering and Mathematical Sciences Building Infrastructure - MEP
Renovation - 13,400 SF
Results
Less than $4,300,000 est. value
Milwaukee, WI

DMC C Building Data Center Improvements
Renovation
Results
Milwaukee, WI 53233

DMC Admissions Center Remodel
Renovation
Results
Milwaukee, WI 53233

DMC Food Court Servery and Cafeteria
New Construction, Renovation
Results
Milwaukee, WI 53233

Renovation for Archives GPC
Renovation - 12,267 SF
Results
$1,921,000 est. value
Milwaukee, WI 53211

Renovation for Archives MEP
Renovation - 12,267 SF
Results
$1,921,000 est. value
Milwaukee, WI 53211

DMC Business Office Relocation
Renovation
Results
Milwaukee, WI 53233

DMC IT Office Remodel
Renovation
Results
Milwaukee, WI 53233

Chemistry Building and Central Utilities Expansion - MEP
New Construction, Addition
Results
$84,000,000 est. value
Milwaukee, WI 53211

Last Updated 09/15/2022 12:33 AM
Project Title

Demolition of Equipment Storage Buildings #3 and #4

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53212   (Milwaukee County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: the demolition of Equipment Storage Building #3, an approximate 4,500-square-foot masonry/wood framed building, and Equipment Storage Building #4, an approximate 9,100-square-foot masonry/concrete building that are part of the Milwaukee Readiness Center campus. The buildings are currently vacant. This project will abate hazardous materials, and demolish the buildings and adjacent concrete and turf areas. Utilities will be properly terminated. Foundations will be completely removed and the building footprints will be backfilled. Concrete sidewalks and retaining walls will be restored and extended on the east side of Equipment Storage Building #4 following demolition. Area will be graded and restored to a parking area. Demolished concrete & masonry building components will be crushed and reused on site as fill and parking surface material where possible. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The walkthrough is scheduled for the purpose of acquainting prospective bidders with the site conditions and special requirements of the project. All bidders are encouraged to attend. A representative of the A/E's office will be available to take questions for answer in addendum. Prospective bidders are asked to familiarize themselves with the project documents and requirements prior to the tour. Nearby street parking is available. Failure to visit the site or failure to examine any and all Contract Documents will in no way relieve, the successful contractor from necessity of furnishing any materials or equipment, or performing, any work, that may be required to complete the work in accordance with the Contract Documents

Details

,, 18,100 SF - 4,500 SF. 13,600 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents