Similar Projects
Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Academy Recreation Center/Gibson Village Complex Development - Phase I - City of Concord
New Construction, Renovation, Infrastructure
Conception
$1,190,000 est. value
Concord, NC 28025

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

Lower Coddle Creek Parallel Interceptor Project
Infrastructure
Bidding
$40,000,000 CJ est. value
Concord, NC 28025

2023 Street Maintenance Proiect: Gelding Drive & Pelham Lane Fall-Depth Reclamation (FDR) & Paving & Emergency Crossover of NC 24-27
Infrastructure
Bidding
$250,000 CJ est. value
Midland, NC 28107

Public Safety Training Facility in Cabarrus County, North Carolina
New Construction, Infrastructure
Post-Bid
$17,000,000 CJ est. value
Concord, NC 28025

FY23 ADA Improvements
Infrastructure
Post-Bid
$267,991 CJ est. value
Harrisburg, NC 28075

Parking Lots and Roadway Improvements
Infrastructure
Results
$1,138,757 CJ est. value
Mount Pleasant, NC 28124

David Phillips Community Center Terraced Garden
Infrastructure
Results
$728,839 CJ est. value
Concord, NC 28025

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Annsborough Park
New Construction, Infrastructure
Construction
$118,000,000 CJ est. value
Concord, NC 28027

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

WW Flowe Park Improvements - City of Concord
Infrastructure
Conception
$5,357,300 CJ est. value
Concord, NC 28025

Last Updated 02/19/2024 05:12 PM
Project Title

Davidson Highway Industrial

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of 2024, this project is underway.

Details

139,800 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents