Similar Projects
Belknap Campus New Residence Hall Phase 2 - Bid Pack 1
New Construction
Post-Bid
Louisville, KY 40292

Site Improvements
Bidding
Liberty, KY

Site Clearing
Post-Bid
Covington, Taylor Mill, KY 41015

Maggie Cane Road Elevation - Site Development
Post-Bid
Barbourville, KY 40906

Site Improvements
Bidding
Berea, KY

St. Claire Medical Center Firestopper Repair
Renovation - 82,000 SF
Bidding
Morehead, KY 40351

AML Reclamation
Results
$212,989 est. value
KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Cold Spring Site Improvements / Vestibule Addition
Results
Cold Spring, KY 41076

Preston Highway Spoil Site Improvements
Results
$100,001 to $250,000 est. value
Louisville, KY 40202

General Ormsby Mitchel Park Improvements Demolition and Site Work
Demolition
Results
Less than $700,000 est. value
Fort Mitchell, KY 41017

Distribution System Site Development
Renovation
Post-Bid
Burgin, Harrodsburg, KY 40330

Last Updated 01/06/2021 01:09 AM
Project Title

James Cooper Slide HP AML Reclamation

Physical Address View project details and contacts
City, State (County) McKee, KY 40447   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $87,985
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

There is an existing slide below the home that has taken out the Wilson Road (currently closed to through traffic) and is threatening the residential structure; this project focuses on protecting the home from damage and/or collapse in the meantime. A larger project is planned when funding becomes available to fix the slide and repair/open the road.The project consists of installing Rail steel to prevent a scarp line from undercutting an existing residential structure. A deep seated subdrain is setup to collect sub surface water that will aid in stability in and around the home. A Class II ditch is setup to handle surface water coming from the Rose site, onto the Isacca property. An 18" HDPE pipe is setup to replace an existing pipe that is clogged and perhaps damaged; the new pipe will ensure long term drainage from the project limits. Class II Backfill, allow with guardrail lagging and filter fabric is included to place behind the rail steel to provide additional stability at the house seat level. Earthwork is setup to grade disturbed area near the end of reclamation activates. This include filling in the existing silt pond and other areas to provide for proper drainage. Silt Barrier - Bales & Silt Fence is setup to prevent sediment from leave the project limits. Revegetation is including for revegetating the residential areas as directed. Dense grade and Roadway stone is setup to provide for repair in kind non-state maintained roadways used for access. No trees, 3" in diameter or greater (breast height) will be disturbed between April 1st and October 31st, except for in the slide and transition zone. Any permits deemed necessary will be obtained prior to reclamation activities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents