Similar Projects
Reservoir Replacement Project at Detroit Lake State Park
New Construction
Results
$475,000 est. value
Detroit, OR 97342

John Day Dam Turbine Runner Replacement and Generator Rewind Project - Industry Site Visit
Renovation
Design
$500,000,000 est. value
Rufus, OR 97050

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
West Linn, OR 97045

McNary Lock & Dam - Structural Steel Heat Straightening
Renovation
Post-Bid
Umatilla, OR 97882

McNary Lock & Dam - Stoplog Seals and Molds
Renovation
Post-Bid
Umatilla, OR 97882

Reported 11/13/2021 12:00 AM
Project Title

Cougar Butterfly Valve Replacement

Physical Address View project details and contacts
City, State (County) Blue River, OR 97413   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cougar Butterfly Valve Replacement at Cougar Dam: Equalizing Line Pressure Monitoring System - construction project to replace the two (2) 90" butterfly valves and control unit systems to improve reliability and safety.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Primary Control Devices, Primary Control Valves, Hydraulically-Operated Primary Control Valves.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents