Similar Projects
Corporate Reconstruction - T-202100 - City of Houston
Infrastructure
Conception
$6,000,000 est. value
Houston, TX 77036

Brazos Street Reconstruction - T-023900 - City Of Houston
Infrastructure
Conception
$14,000,000 est. value
Houston, TX 77006

Parkland Village Section 49 / Parkland Row
Infrastructure
Design
$2,750,000 est. value
Cypress, TX 77433

Booker T Washington Vision Plaza / Booker T. Washington High School
New Construction
Design
$200,000 est. value
Houston, TX 77018

Excavation, Spoil Disposal and Stormwater Outfall
Infrastructure
Bidding
$600,000 est. value
Houston, TX

Clearing and Grubbing for Inner Belt Northwest
Infrastructure
Bidding
$200,000 est. value
Houston, TX

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Sunterra Mass Grading and Detention Phase IIB
Infrastructure
Post-Bid
TX

Formal-CSP Beltway 8 Site Preparation
Results
Houston, TX

Construction of the Bridgeland Convenyance Channel South of Creekland Village Section 1 and 2
Results
TX

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

HEB Houston 59 #656 Curbside
Renovation, Addition - 5,879 SF
Construction
$250,000 est. value
Cypress, TX 77433

Alabama Street Reconstruction - T-021300 - City Of Houston
Infrastructure
Conception
$14,000,000 est. value
Houston, TX 77282

Clearing and Grubbing for Acquired Land
Infrastructure
Post-Bid
TX

Wood Leaf Phase 1 Detention & Fill Plan
New Construction
Results
Tomball, TX 77375

Reported 07/13/2022 03:23 PM
Project Title

Freeway Manor South Area - M-410008 - City of Houston

Physical Address View project details and contacts
City, State (County) Houston, TX 77034   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Design Development, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $12,782,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Houston, Texas. Design plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot. Provides ROW acquisition, design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways, and underground utilities to serve the Freeway Manor Sub, CDP outfall C0281 and adjacent drainage areas, Sims Bayou Watershed. The project addresses a need identified and prioritized through the ReBuild Houston Process utilizing a worst first methodology, objective data and benefit/cost analysis. The project will be designed and constructed to improve drainage of streets and reduce the risk of structural flooding. As of July 12, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents