Similar Projects
Residential Subdivision
New Construction
Conception
Johns Creek, GA 30022

Buckhead Tower Ritz-Carlton and Condos
New Construction
Conception
Atlanta, GA 30326

Anderson's Barbecue
Renovation - 2,500 SF
Design
$500,000 est. value
Atlanta, GA

Encore Commons
New Construction - 17,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Maileg North American Headquarters
Renovation, Addition - 36,000 SF
Bidding by Invitation
$1,000,000 to $5,000,000 CJ est. value
Atlanta, GA 30314

Abbington at Ormewood Park
New Construction - 46,200 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Atlanta, GA 30316

Chick-fil-A #873
New Construction - 4,980 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Fulton County Housing Rehabilitation Program
Post-Bid
Atlanta, GA 30303

OPLA 28th Summit Federal Building Office Suite
Renovation - 10,246 SF
Results
Atlanta, GA 30301

Neighborhood Stabilization Program
Results
Less than $840,107 est. value
Atlanta, GA

Castleberry Park
New Construction - 350,000 SF
Construction
$33,000,000 est. value
Atlanta, GA

Bethel Towers Apartments
Renovation
Construction
Atlanta, GA

903 Peachtree
New Construction - 387,656 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30309

Flip'd
Renovation - 1,625 SF
Pending Verification
Atlanta, GA 30363

Six West
New Construction
Conception
College Park, GA

Reported 04/09/2021 01:13 PM
Project Title

397 North Central Avenue

Physical Address View project details and contacts
City, State (County) Hapeville, GA 30354   (Fulton County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service, Office, Single-Family Homes
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

284 apartments and 24 for-rent townhomes, 20,000 square feet of offices and 5,000 square feet of retail and restaurants.

Details

,, 25,000 SF - Office, 20,000 SF New Construction, Apartments/Condominiums, New Construction, 284, 24 Single-Family Homes, New Construction, Food/Beverage Service, 5,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents