Similar Projects
WaFD Bank - Loan Production Office
Renovation
Conception
Albuquerque, NM 87102

Presbyterian Healthcare Services - Support and Patient Rooms
New Construction, Addition - 454,000 SF
Design
$10,000,000 CJ est. value
Albuquerque, NM 87106

North Albuquerque Acres - Apartments
New Construction - 75,083 SF
Design
Albuquerque, NM 87122

Installation of a Modular Office Building
Post-Bid
Albuquerque, NM

Make-Ready for the Parking Structure
Post-Bid
Albuquerque, NM

Valle De Atrisco Family Apartments
New Construction
Construction
$33,700,000 est. value
Albuquerque, NM

Hilton Garden Inn - Homewood Suites
New Construction - 134,405 SF
Construction
$25,000,000 est. value
Albuquerque, NM 87102

Netflix and ABQ Studios
New Construction - 170,000 SF
Pending Verification
$10,000,000 est. value
Albuquerque, NM

Verus Research
Renovation - 27,000 SF
Pending Verification
Albuquerque, NM 87110

The Pine Needle at Winrock
New Construction
Design
$45,000,000 est. value
Albuquerque, NM 87110

The Commons at Martineztown
Renovation
Post-Bid
$6,100,000 est. value
Albuquerque, NM 87102

Broadstone Nob Hill
New Construction - 125,772 SF
Construction
$21,500,000 est. value
Albuquerque, NM 87108

Roses Southwest Papers Expansion
Addition
Pending Verification
Albuquerque, NM 87102

Apartment Complex
New Construction - 136,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Albuquerque, NM 87107

Phase I - Make-Ready For The Parking Structure
Post-Bid
Albuquerque, NM 87106

Last Updated 04/27/2021 08:48 AM
Project Title

Markana Uptown

Physical Address View project details and contacts
City, State (County) Albuquerque, NM 87110   (Bernalillo County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Office, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Obtained from a News Source, Construction Start Expected third quarter 2021, Construction Completion Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, New Construction, 1 Fitness Center, New Construction, 1 Apartments/Condominiums, 6 Stories Above Grade, 589 to 1,226 SF New Construction, 243 Unit(s), 1 Parking Garage, 2 Stories Above Grade, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents