Similar Projects
RFP - 1367 West Sherman Redevelopment
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Muskegon, MI 49441

RFP Engineering - 2022 (FY23) Hot-Mix Asphalt (HMA) Milling, Overlay, Resurfacing and Hot-In-Place (HIP) Construction Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

National Guard Bureau, Region 2, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Results
$75,000 to $40,000,000 est. value

RFQ Engineering - Vulcan Water Main Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Norton Shores, MI 49444

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Airport Engineering Consulting Services
Term Contract
Post-Bid
Muskegon, MI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

As-Needed Design Survey Services
Infrastructure
Post-Bid

C--Multiple Award Task Order Contract (MATOC) for Geotechnical Engineering Service
Results
$500 to $25,000,000 est. value

Last Updated 03/22/2023 10:12 AM
Project Title

Getty Street Traffic Study - City of Muskegon

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49440   (Muskegon County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 22, 2023, a consultant has been selected for the project study. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: All proposals must be submitted following the proposal format supplied in this document and shall be subject to all requirements of this document. The City may consider as irregular any proposal in which there is an alteration of or departure from the format stated in the RFP documents, and at its option may reject the same. Each firm will include in their proposal a listing of each principal and the names of any proposed sub-consultant/contractor and the name and address of each office which may be involved in the project. Before executing any subcontract, the successful firm shall submit the name and principals of any proposed subcontractor for prior approval. The City of Muskegon is seeking proposals from qualified firms to provide comprehensive traffic engineering services relative to all aspects of a proposed traffic study on Getty Street from Hovey Avenue north to just north of Apple Avenue (Approximately 2.00 Miles in length). The proposed traffic study is anticipated to commence upon notice to proceed and to be completed in the fall of 2022. The existing roadway section in the project area varies from 4 to 5 lanes. The route is identified as part of the NHS system throughout the length of the study area and is classified as a principal arterial. The route is entirely an urban setting and is primarily a commercial/light industrial corridor with areas of residential. There are nine (9) signalized intersections and many unsignalized intersections along the route. The traffic study timeframe is likely to overlap with another planned traffic study / pilot project on Shoreline Drive. The study on Getty Street should take into consideration any temporary and long term impacts that may be applicable to Getty Street as a result of the work on Shoreline Drive. Meet with the city/municipalities to discuss the scope of the project. Include other stakeholders such as MDOT, WMSRDC, and MATS transit. Review existing and needed data, identify processes to obtain the needed data, and present a schedule for the study that identifies future potential funding opportunities and how they fit into the project timeline. The City anticipates there will be a need for two meetings; a kickoff meeting with the city/municipalities and stakeholders, and a meeting to review the preliminary report with the same (or similar) group. The city/municipalities, separately or together, may request additional meetings outside the scope of the study to assist with public input, presentation of the findings to governing bodies and/or related boards, and to assist with grant funding identification or preparation. Issue RFP ...................................................................June 21, 2022 Preliminary Selection .................................................July 18, 2022 Price Negotiations ......................................................July 18-22, 2022 Recommendation Due to City Commission ..............July 26, 2022 City Commission Consideration ................................August 9, 2022 The City reserves the right to reject any and all proposals and to waive any irregularity in proposals received whenever such rejection or waiver is in the best interest of the City. The firm to whom the Award is made will be notified at the earliest possible date. All firms submitting proposals will be notified when the award is made. Award will not be completed until confirmed and recommended by the city commission. The method of contractor selection has not been determined at this time

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents