Similar Projects
Last Updated | 03/22/2023 10:12 AM |
Project Title | Getty Street Traffic Study - City of Muskegon |
Physical Address | View project details and contacts |
City, State (County) | Muskegon, MI 49440 (Muskegon County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected July 2024 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 22, 2023, a consultant has been selected for the project study. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: All proposals must be submitted following the proposal format supplied in this document and shall be subject to all requirements of this document. The City may consider as irregular any proposal in which there is an alteration of or departure from the format stated in the RFP documents, and at its option may reject the same. Each firm will include in their proposal a listing of each principal and the names of any proposed sub-consultant/contractor and the name and address of each office which may be involved in the project. Before executing any subcontract, the successful firm shall submit the name and principals of any proposed subcontractor for prior approval. The City of Muskegon is seeking proposals from qualified firms to provide comprehensive traffic engineering services relative to all aspects of a proposed traffic study on Getty Street from Hovey Avenue north to just north of Apple Avenue (Approximately 2.00 Miles in length). The proposed traffic study is anticipated to commence upon notice to proceed and to be completed in the fall of 2022. The existing roadway section in the project area varies from 4 to 5 lanes. The route is identified as part of the NHS system throughout the length of the study area and is classified as a principal arterial. The route is entirely an urban setting and is primarily a commercial/light industrial corridor with areas of residential. There are nine (9) signalized intersections and many unsignalized intersections along the route. The traffic study timeframe is likely to overlap with another planned traffic study / pilot project on Shoreline Drive. The study on Getty Street should take into consideration any temporary and long term impacts that may be applicable to Getty Street as a result of the work on Shoreline Drive. Meet with the city/municipalities to discuss the scope of the project. Include other stakeholders such as MDOT, WMSRDC, and MATS transit. Review existing and needed data, identify processes to obtain the needed data, and present a schedule for the study that identifies future potential funding opportunities and how they fit into the project timeline. The City anticipates there will be a need for two meetings; a kickoff meeting with the city/municipalities and stakeholders, and a meeting to review the preliminary report with the same (or similar) group. The city/municipalities, separately or together, may request additional meetings outside the scope of the study to assist with public input, presentation of the findings to governing bodies and/or related boards, and to assist with grant funding identification or preparation. Issue RFP ...................................................................June 21, 2022 Preliminary Selection .................................................July 18, 2022 Price Negotiations ......................................................July 18-22, 2022 Recommendation Due to City Commission ..............July 26, 2022 City Commission Consideration ................................August 9, 2022 The City reserves the right to reject any and all proposals and to waive any irregularity in proposals received whenever such rejection or waiver is in the best interest of the City. The firm to whom the Award is made will be notified at the earliest possible date. All firms submitting proposals will be notified when the award is made. Award will not be completed until confirmed and recommended by the city commission. The method of contractor selection has not been determined at this time |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |