Similar Projects
Emerald Trail - Hogan Street Connector - City of Jacksonville
Infrastructure
Conception
$5,760,000 CJ est. value
Jacksonville, FL 32202

Emerald Trail - Hogan Street Connector - City of Jacksonville
Infrastructure
Conception
$5,760,000 CJ est. value
Jacksonville, FL 32202

On the Move Car Wash
Demolition, New Construction, Infrastructure - 4,983 SF
Design
$2,700,000 CJ est. value
Jacksonville, FL 32216

The Hardwick at Ford on Bay
New Construction, Infrastructure - 25,000 SF
Design
$140,000,000 CJ est. value
Jacksonville, FL 32202

Rehibilitation of the Blue Cypress Park Pool
Infrastructure
Bidding
$200,000 CJ est. value
Jacksonville, FL 32277

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water Intrusion Repairs, Bennett Fed Bldg, Jacksonville, FL
Results
$1,000,000 to $5,000,000 est. value
Jacksonville, FL 32202

Design-Build Services for Horizontal/Civil Engineering (Horizontal) Projects
Infrastructure
Results
Jacksonville, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

DCPS(Duval County Public Schools) Rutledge Pearson Elementary School
New Construction, Infrastructure - 95,933 SF
Construction
$15,000,000 CJ est. value
Jacksonville, FL 32208

Baptist Health Primary Care Clinic / The Exchange at eTown
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Jacksonville, FL 32256

Baptist Health Primary Care Clinic / The Exchange at eTown
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Jacksonville, FL 32256

Museum of Science & History at the Shipyards (MOSH Genesis)
New Construction, Infrastructure - 130,000 SF
Design
$120,000,000 CJ est. value
Jacksonville, FL 32202

RFP Engineering - SR9/I-95 from Forest St. to Railroad Bridge
Infrastructure
Post-Bid
$15,957,762 CJ est. value
Lake City, FL 32055

Last Updated 06/29/2023 04:46 PM
Project Title

Resurfacing - SR 208

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32210   (Duval County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,377,452 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Duval Road Name: SR 208 (Wilson Blvd) Limits: From Debra Dr to Lane Ave Project(s): 44712915201(*) Federal Aid No: D223007B Total Roadway Length: 0.800 Miles Contract Days: 150 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.800 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days The Improvements under this Contract consist of milling and resurfacing, drainage improvements, curb and gutters, traffic signals, lighting, highway signing, sidewalks/bicycle path and other incidental construction on SR 208 (Wilson Blvd) from Debra Drive to Lane Ave in Duval County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 015 Resurfacing - SR 208

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents