Similar Projects
San Isidro Branch Library - 08-LIB-002 - City of Laredo
New Construction, Infrastructure - 12,000 SF
Conception
$3,500,000 CJ est. value
Laredo, TX 78040

Fire Station 3 (San Bernardo) - 23-FIRE-004 - City of Laredo
Demolition, New Construction, Infrastructure - 7,850 SF
Conception
$2,750,000 CJ est. value
Laredo, TX 78040

North Laredo Business Park Building 3
New Construction, Infrastructure - 236,390 SF
Design
$14,183,400 CJ est. value
Laredo, TX 78040

UHS Laredo Clinic / Villas San Augustin Plaza
New Construction, Infrastructure - 7,130 SF
Design
$1,700,000 CJ est. value
Laredo, TX 78045

Freer TX Border Patrol Station (BPS) Complex
LEED Certification, New Construction, Infrastructure - 47,000 SF
Post-Bid
$100,000,000 CJ est. value
Freer, TX 78357

Manadas Creek Drainage Improvements North Central Park Phase 1C Water Feature
Infrastructure
Post-Bid
$300,000 CJ est. value
Laredo, TX 78040

United ISD Food Production Center
New Construction, Infrastructure
Results
$51,854,000 CJ est. value
Laredo, TX 78043

EL Pico Water Treatment Plant High Service Pump Station Improvements
Renovation, Infrastructure
Results
$806,000 CJ est. value
Laredo, TX 78045

Freddy's Frozen Custard & Steakburgers / Laredo
New Construction, Infrastructure - 2,996 SF
Construction
$1,550,000 CJ est. value
Laredo, TX 78045

JG Warehouse
New Construction, Infrastructure - 183,600 SF
Construction
$11,934,000 CJ est. value
Laredo, TX 78045

IHOP-Laredo
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Laredo, TX 78043

TPA Hachar - Building 3
New Construction, Infrastructure - 458,648 SF
Pending Verification
$27,518,880 CJ est. value
Laredo, TX 78040

8"-15" IH 69 SS Relocations - District 5 - 18-WW-001 - City of Laredo
Infrastructure
Conception
$2,000,000 CJ est. value
Laredo, TX 78042

Las Lomas Car Wash
New Construction, Infrastructure - 1,000 SF
Design
$350,000 CJ est. value
Laredo, TX 78046

Riverbend Hike and Bike Trail Project - Phase 1
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Laredo, TX 78040

Last Updated 10/16/2023 06:07 AM
Project Title

Gateway MUD No.1 Water Plant No.1, Phase 1

Physical Address View project details and contacts
City, State (County) Laredo, TX 78040   (Webb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $4,876,211 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

QUESTIONS: Due by Wednesday 5:00 PM, August 30, 2023. Submit all questions on CivCast. Water Plant in Laredo, Texas Work covered by these Technical Specifications is entitled 'Water Plant No. 1, Phase 1 for Gateway MUD No.1, Webb County, Texas.' Description of Work: a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and the Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Construct Water Plant No. 1 including all site work necessary for water plant construction, fill compacted to grade, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400 gpm, one 700 gpm, and two 1,400 gpm booster pumps, chlorination system, electrical and instrumentation with building and fencing for a fully operational plant. (2) Furnish and install all appurtenances and systems necessary for a fully operational plant. (3) Perform testing as specified on installed lines. (4) Clean-up project area upon completion. The Work, which shall include the furnishing of all material, equipment, labor, and supervision necessary or incidental for the construction of Water Plant No. 1, Phase 1 for Gateway MUD No. 1. The Project includes all site work necessary for water plant construction, including but not necessarily limited to fill and grading, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400-gpm jockey pump with VFD, one 700-gpm booster pump with VFD, two 1,400 gpm booster pumps with soft start, chlorination system, electrical and instrumentation with building, fencing including all appurtenances and systems for a fully operational plant

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents