Similar Projects
Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Baggage Make-Up Unit Replacement and Baggage Handling System Improvements
Post-Bid
Killeen, TX 76549

Airport Improvements
Results
Vernon, TX 76384

Terminal D Board Owned Passenger Boarding Bridge Rehabilitation
Renovation
Results
$4,254,000 est. value
Dallas, TX

Stacy Green
New Construction
Construction
Allen, TX 75013

Gatherings at Twin Creeks
New Construction
Construction
Allen, TX 75013

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Terminal D SV Mezzanine Base Building Corrections
Renovation
Results
$473,795 est. value
Dallas, TX 75261

Hilton Garden Inn
New Construction - 115,244 SF
Construction
$30,500,000 est. value
Austin, TX 78758

Parking Garage III
Results
El Paso, TX

Element by Westin
New Construction - 202,006 SF
Construction
$18,000,000 est. value
Austin, TX 78758

New Airport Terminal Building – Refugio County
Results
Less than $381,749 est. value
Refugio, TX 78377

Mixed-Use Condominium Building - RFP #5
New Construction - 109,500 SF
Construction
$29,400,000 est. value
Austin, TX 78704

Pressler Street Garage 2 - Design Build
Results
$21,500,000 est. value
Houston, TX 77030

Last Updated 03/17/2021 09:42 AM
Project Title

Royal Caribbean Cruise Terminal

Physical Address View project details and contacts
City, State (County) Galveston, TX 77550   (Galveston County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Parking Garage
Contracting Method Qualified Bidding.
Project Status Construction Documents, Construction Start Expected April 2021, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Airline/Passenger Terminal, 2 Stories Above Grade, 170,000 SF New Construction, 10 Acres, 1 Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents