Similar Projects
Road Reconstruction at Crosby-Lynchburg (Phase 3) between Magnolia Drive and Lochness Drive for Harris County Precinct 2
Bidding
Houston, TX 77336

Metro Bus Drive Lane Reconstruction William P. Hobby Airport
Bidding
Houston, TX 77061

North Main Street Concrete Paving and Preservation
Post-Bid
Baytown, TX 77520

Canniff Utah and Montana Streets Asphalt
Post-Bid
South Houston, TX 77587

Road Construction at Madera Run Parkway Between Boundary Waters Land and Kings Park Way, PCT 2
Results
Houston, TX 77002

Replacement of the Thin-Bonded Permeable Friction Course (TBPFC) Overlay Replacement and Sam Central Toll Plaza Fault Repair
Results
Less than $4,900,000 est. value
Houston, TX 77040

Proposed Waterline, Sanitary Sewer, Non-Potable Waterline, Storm Sewer and Paving Improvements on Bridgeland Prairieland Village Section 6
Bidding
TX

Springwoods Village - CityPlace Roadways Phase III
Post-Bid
TX

Planing, Underseal, Overlay and Pavement Markings
Results
Less than $12,023,523 est. value
TX

Roadway and Facility Management, Inspection and Maintenance (Section I)
Post-Bid
Houston, TX 77002

Road Reconstruction at the Beamer Road and FM 2351 Intersection
Results
Less than $2,497,831 est. value
TX

Ector at Hidalgo Street Intersection Improvements
Post-Bid
Houston, TX 77056

Concrete Pavement Repair
Term Contract
Results
Less than $2,539,677 est. value
TX

2020 Annual Paving and Drainage Improvements
Term Contract
Post-Bid
Pasadena, TX 77506

Windfern Road and Spring Brook Village Amenity Center
Results
Houston, TX 77042

Last Updated 01/07/2021 12:43 PM
Project Title

Cavalcade Street Bike Lane Phase II

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,360,225
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a long-term retrofit for High Comfort (Buffered) Bike Lanes on each side of Cavalcade Street from Irvington Boulevard to Elysian Street (3,000 FT). All construction will be completed in accordance with the requirements from METRO, the City of Houston (COH), Texas Department of Licensing and Regulation (TDLR) and the Americans with Disabilities Act (ADA).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents