Similar Projects
LED Lamps
Post-Bid
Huntsville, TX

Off The Grid Solar Panel Based Renewable Energy System
Post-Bid
Houston, TX

Addison Airport Toll Tunnel Sump Pump Wiring Systems
Results
$1,000,000 to $2,000,000 est. value
Addison, TX 75001

Law Enforcement (LE) Modular Office Building Utilites
Results
$225,000 to $275,000 est. value
Austin, TX 78744

1313 Main Street Standby Generator Project
Post-Bid
Houston, TX 77002

Site Electrical and Water Distribution Replacement
Results
Less than $425,300 est. value
El Paso, TX 79905

Furnish and Install Electric Actuators
Term Contract
Post-Bid
Houston, TX 77000

District Wide Lighting Upgrades
Results
El Paso, TX 79932

Electrical Maintenance and Repair Services
Term Contract
Post-Bid
Galveston, TX 77550

Facilities Maintenance, Electrical, Equipment, Parts and Services
Term Contract
Results
Seguin, TX

Emergency Lighting Inspection and Related Services
Post-Bid
Dallas, TX 75390

Preventive Maintenance and Repair Services for 138 KV Substations and Other High/Medium Voltage Electrical Equipment
Term Contract
Results
Houston, TX 77002

Electrical Services
Post-Bid
Fort Worth, TX 76100

Buffalo Lake Electric Install
Results
$30,000 to $38,000 est. value
Umbarger, TX

Electrical Parts, Supplies, Services
Term Contract
Post-Bid
Huntsville, TX 77340

Reported 10/14/2021 12:00 AM
Project Title

Power Pole Maintenance

Physical Address View project details and contacts
City, State (County) Lubbock, TX   (Lubbock County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The intent of these specifications is to describe the continuation of an ongoing remediation program to perform repair and replacement of defective pole structures, crossarms, conductors, hardware, and to perform pole inspection services as requested by the department. The contractor shall coordinate with the City’s representative to determine a priority listing of all structures and equipment that need immediate repair or replacement. Historically Underutilized Businesses (HUB's): 51%.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents