Similar Projects
2020 Street Bundle-Sector I
Infrastructure
Bidding
Denton, TX 76207

Double Oaks Drive
Infrastructure
Bidding
Double Oak, TX 75077

Lake Ralph Hall Roadway Relocations Project
Post-Bid
Lewisville, TX 75067

Pecan Square Phase 2B-1 Improvements Paving, Signage, and Lighting
Post-Bid
Northlake, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Southern Region Disaster Recovery Support BPA
Results

Paving, Signage, and Lighting Infrastructure for Pecan Square Phase 2B-2
Post-Bid
Northlake, TX

Street Improvement Project Phase 2
Results
Highland Village, TX

Paving, Signage, and Lighting Infrastructure for Pecan Square Phase 2B-3
Post-Bid
Northlake, TX

Canyon Falls - Village 10-AR - Earthwork, Utility and Paving Improvements
Results
Argyle, TX 76226

Cedarcrest Lane
Post-Bid
Double Oak, TX 75077

Denton Enterprise Airport (DEA) Landside Paving Improvements
Results
$855,163 est. value
Denton, TX 76207

Timberleaf Drive
Post-Bid
Double Oak, TX 75077

Linden Hills Phase 1 - Paving
Results
Little Elm, TX 75068

Castle Hills Tract K Phase 2 Commercial Development Earthwork, Utilities and Paving
Post-Bid
Lewisville, TX 75028

Reported 09/23/2021 12:00 AM
Project Title

Murrell Park Front Entrance (Construction) Road Repair and Repaving

Physical Address View project details and contacts
City, State (County) Flower Mound, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove approximately two (2)- four (4) inches of existing asphalt on approximately 431 LF of Park road. Average width of the road is approximately 25 LF. Remove existing base course add 8" of new flex base compact and graded. After proper road and curb preparation contractor will install 4” of hot mix asphalt. The turnaround at the entrance to the park the contractor shall remove approximately two (2) – four (4) inches of existing asphalt on approximately 750 LF of park road. The average width of the road is approximately 15ft. remove the existing base course approximately 6” deep, add 8” of new flex base compacted and graded. Contractor shall come back with 4” of hot mix asphalt on 661 LF of compacted flex base at a road width of 14 LF. Contractor shall replace the back side of the turn around with 8” of reinforced concrete pavement at approximately 90 LF by 18 LF. the finished road shall transition smoothly to adjacent roads. Contractor shall Construct 1500 LF of concrete curbs 6" x 18"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents