Similar Projects
Unr - Install Replacement Heat Exchanger And Control Valves
Term Contract
Bidding
$100,000 to $200,000 est. value
Reno, NV 89512

CBC (Classroom Building Complex) Cooling Towers Repairs
Alteration
Bidding
$108,000 est. value
Las Vegas, NV 89154

Fume Hood
Post-Bid
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

J045--Chiller Comprehensive Service and Maintenance
Results

J045--Chiller Comprehensive Service and Maintenance
Results

Annual Service Agreements - Electrical , HVAC Heating and Air , Flooring , Cabinets/Countertops
Term Contract
Bidding
Schurz, NV

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

Fire Station 51 Heat Pump Replacement Project
Alteration
Bidding
$70,000 est. value
Carson City, NV 89701

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Replace Kitchen Air Handling Unit Boulder City High School
Alteration
Bidding
$271,000 est. value
Boulder City, NV 89005

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Last Updated 05/18/2022 12:52 AM
Project Title

Community Center Rooftop HVAC Unit 1 and 2 Replacement Project

Physical Address View project details and contacts
City, State (County) Carson City, NV 89701   (Carson City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes but is not limited to replacing two existing rooftop HVAC units at the Carson City Community Center. The bid price shall include costs for engineer design and specifications, local and state permitting, removal of existing units, installation of new units with any required plumbing/venting, and all tools, equipment, materials, and labor for the full installation of the two new HVAC units. The project includes all common phases of construction customarily associated with this type of project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents