Similar Projects
Ram Tools
Renovation - 50,917 SF
Construction
$150,000 to $180,000 est. value
Alexandria, VA 22304

Warehouse Air Rail Ave
Post-Bid
Virginia Beach, VA 23455

Amazon Fullfilment Center
New Construction - 3,200,000 SF
Design
$200,000,000 est. value
Suffolk, VA

Amazon Fulfillment Center
Renovation - 798,000 SF
Conception
Prince George, VA 23875

ABC Beverage Company
New Construction - 410,000 SF
Construction
$91,000,000 est. value
Mechanicsville, VA 23116

Merritt Business Park at Quantico Corporate Center
New Construction - 342,000 SF
Construction
$30,000,000 est. value
Stafford, VA 22554

Green Top Industrial Park
New Construction - 385,800 SF
Design
Mechanicsville, VA

Wegman`s Distribution Center
New Construction - 1,000,000 SF
Design
$175,000,000 est. value
Ashland, VA 10042

Services for Construction of the Lifecycle Overhaul and Upgrade (LOU) Facility
New Construction - 33,000 SF
Construction
Less than $52,183,632 est. value
Fredericksburg, VA 22408

Blue Firebird at The Grove
New Construction - 1,500,000 SF
Conception
$10,000,000 CJ est. value
Chesapeake, VA

Amazon Delivery Station - DOR2
Renovation - 163,484 SF
Construction
Norfolk, VA 23502

Amazon Delivery Station
New Construction - 100,000 SF
Design
Hampton, VA 23669

Fairlead
New Construction
Design
Portsmouth, VA

Last Updated 08/05/2020 10:59 AM
Project Title

RCS Recyling Facility

Physical Address View project details and contacts
City, State (County) Winchester, VA 22602   (Frederick County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method
Project Status Obtained from a Public Office, Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New building that is projected to be 30,000 square feet in area that will allow for internal storage and processing of collected clean, reusable recycled materials.

Details

Industrial Warehouse, 30,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents