Similar Projects
Fulton at Mississippi and Fulton at Nebraska Lift Station D6-4 and D6-7 Rehabilitation
Renovation
Bidding
Gretna, LA

High Lift Pump Room and the Panola Pump Station Improvements
New Construction
Bidding
New Orleans, LA

River Pump Station Hazard Mitigation
Renovation
Post-Bid
Baton Rouge, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Sunshine Wastewater Treatment Plant - Effluent Pump Station Rehabilation
Renovation
Results
$359,000 est. value
Sunshine, LA

Constructing a Stormwater Pump Station
New Construction
Bidding
Saint Martinville, LA

Naquin Street Sewer Lift Station
Renovation
Post-Bid
Less than $465,000 est. value
Houma, LA

Construction Of West Monroe Pump Station Repairs
New Construction
Results
Monroe, LA

Lift Station D6-4 & D6-7 Rehabilitation
Renovation
Bidding
Gretna, LA

Tangi Lakes LS & FM Improvements
New Construction
Post-Bid
$580,000 est. value
Hammond, LA

Lift Station and Blower Controls Electric Panels
New Construction, Alteration
Results
LA

Lift Stations 16 and 26 Rehabilitation
Renovation
Bidding
Mandeville, LA

Pete's Highway Lift Station
New Construction
Post-Bid
Denham Springs, LA

First Camellia (PS 510), Second Camellia (PS 511) and W. Camellia (PS 512) Sewer Lift Station Upgrades
Renovation
Post-Bid
Slidell, LA

Reported 09/22/2021 12:00 AM
Project Title

Farmsite Pump Station Force Main from Pump Station R2-01 to Riverbend Pond

Physical Address View project details and contacts
City, State (County) Chalmette, LA   (Saint Bernard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all supervision, labor, equipment, and materials necessary to construct a new sewerage force main to connect the proposed Farmsite and Torres Sewer Lift Station to the existing Riverbend Oxidation Pond.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents