Similar Projects
Last Updated | 02/22/2021 11:25 AM |
Project Title | Resurfacing Project |
Physical Address | View project details and contacts |
City, State (County) | FL (Escambia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the resurfacing and/or reconstructing in portion or whole of Centre Street, East Shore Drive, Heatherwood Drive, Creek Ridge Drive, Bridge Creek Terrace, Brook Bend Road, Brook Bend Circle, Little Creek Lane, Bluebay Lane, Little Creek Drive, Tarklin Oaks Drive, Tarklin Oaks Circle, Alexandria Drive, Edison Drive, Garfield Drive, Potomac Drive, Webster Drive, Madison Drive, La Rua Street, Kinnear Avenue, Almax Court, Balderas Avenue, Atlanta Avenue, Gadsden Street, Wiggins Avenue, Birch Avenue, Alton Road, Hurd Lane, Runyan Street, T Street, 50th Avenue, Wingate Street, Alvin Drive, Landing Lane, Diamond Dairy Road, Kelly Avenue, Loretta Street, J Street, Weaver Street, Andrew Avenue, Hobart Avenue, Kyle Drive, Lilac Lane, Pittman Avenue, Rhythm Street, Breezewood Circle, Perth Avenue, Jacquelyn Way, Maxwell Street, Austin Street, Okaloosa Avenue, Kipling Street, Fairchild Street, Chapel Street, Mirabelle Drive, Mirabelle Lane, Mirabelle Circle, Copter Road, Grow Road, McLemore Street, Paul Starr Drive, Paul Star Road, Jakes Road, Scepter Court, Nokomis Road, McKenzie Road, Parker Road and Plainfield Avenue. This project will also include other work associated with the reconstruction of roadways such as maintenance of traffic, stormwater pollution prevention, sod stabilization shoulder work, pavement striping, possible dewatering, etc. The contractor is to maintain traffic flow at all times, with minimal delays. Roadways are to have two- way traffic opened during all non-working hours. Closure of one lane will be allowed only during working hours. The Escambia County Road Department will retain 30 loads of milling from this project. Escambia County will provide trucks to haul the 30 loads of milling from the jobsite. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |