Similar Projects
RFP Construction Manager at Risk - Toomer Elementary Building Improvement and Renovations
Renovation
Bidding
$400,000 CJ est. value
Atlanta, GA 30317

New West Augusta Middle School Site Grading
New Construction, Infrastructure
Bidding
$125,000 CJ est. value
Augusta, GA 30904

2023 Annual Bid for Concrete Pipe
Term Contract
Sub-Bidding
Moultrie, GA 31768

Fleet Services Concrete Pad
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Appling, GA 30802

As Needed Concrete
Alteration
Post-Bid
GA

Construct Canopy and Concrete Work
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Savannah, GA

Goodyear Clubhouse Renovation - Concrete Slab
Results
Cartersville, GA 30120

Goodyear Clubhouse Renovation - Concrete Grind and Finish
Results
Cartersville, GA 30120

Annual Concrete Pipe
Term Contract
Post-Bid
GA

Reinforced Concrete Pipe and Fittings
Results
GA

Procurement of Canine Kennels Concrete Slabs
Alteration
Post-Bid
Less than $200,000 est. value
Covington, Hampton, Stockbridge, Temple, Villa Rica, GA 30180

Replace Concrete Driveway Pad at Forsyth Fire Station
Results
Forsyth, GA 31029

Canopy and Concrete Demolition and Replacement at Fire Station 51
Alteration
Post-Bid
Marietta, GA

3 Concrete Slabs for Sheriff`s Firing Range
Alteration
Results
$125,000 to $150,000 est. value
Savannah, GA 31405

Landfill Scale Replacement
Infrastructure
Post-Bid
Rome, GA

Last Updated 09/19/2022 08:40 AM
Project Title

Patterson Hall Restrooms Renovations

Physical Address View project details and contacts
City, State (County) Valdosta, GA 31602   (Lowndes County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Patterson Hall (residence hall) on the main campus of Valdosta State University. The purpose of this project is to completely renovate and modernize the toilet and shower facilities Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of thirty-five days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents