Similar Projects
Pittsburgh Theological Seminary Phase 2 - 3 Interior Loop Road
New Construction
Conception
Pittsburgh, PA 15206

Moon Golf Club Storage Building - Site Work Construction
Bidding
Moon Township, PA 15108

Gateway Middle School - Additions & Renovations (Sitework Construction)
Bidding
Monroeville, PA 15146

Authority Wide Site Improvements
Post-Bid
Pittsburgh, PA 15219

UST System Closures at Three Sites in NJ &PA
Renovation
Post-Bid

Ohara Elementary School Site Improvements
Results
Pittsburgh, PA 15238

Fox Chapel Area High School Site Improvements Project
Results
Pittsburgh, PA 15238

Hertz, Dollar and Thrifty Service Lot/Facility Reallocation
Renovation - 4,000 SF
Construction
$200,000 est. value
Pittsburgh, PA 15231

Price Sign Footings Replacement & Landscaping
Renovation
Post-Bid

Abandoned Mine Reclamation Project
Results
Less than $100,000 est. value
Churchill, PA 15145

Abandoned Mine Reclamation Project, Renton South
Results
Less than $100,000 est. value
Plum, PA

AMR Renton Mine Fire, Plum Borough
Results
$1,000,000 to $5,000,000 est. value
Plum, PA

Site Preparation
Results
Pittsburgh, PA 15123

Abandoned Mine Reclamation Project
Results
Less than $100,000 est. value
Plum, PA

Pittsburgh Zoo and PPG Aquarium Compass Point Plaza-Sitework Phase
Results
Pittsburgh, PA 15206

Reported 11/13/2020 12:00 AM
Project Title

Schenley Clubhouse Site Work Renovations

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the site work include the following: All site demo of the existing building shall not be included, as this work is already complete. •All utilities that served the old building have been abandoned and shall be excluded. •Site water service shall be excluded. •Site sanitary shall be excluded. •Site gas service shall be excluded. •Site electrical service shall be excluded. This includes all underground conduit from the DLCO pole to the Building as well as all site lighting (poles & bases & “First Tee” welcome sign) •Foundation drain at the building footers shall be excluded. However, the site storm water contractor shall include connection from 5’ off the Building to complete the scope of work. •Concrete paving inside the Dumpster Enclosure & Mechanical Room shall be excluded. •E&S at building construction

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents