Similar Projects
Redlands Christian Migrant Charter School
New Construction
Conception
Mulberry, FL 33860

New K-5
Conception
FL

Faith and Life Fellowship Ministries and Alpha International Academy Charter School
New Construction, Renovation, Demolition - 19,443 SF
Design
$3,000,000 est. value
Hollywood, FL 33020

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

New Marianna K-8 School
New Construction - 335,000 SF
Post-Bid
Less than $50,000,000 est. value
Marianna, FL

Construction Manager at Risk Services for Robert C Markham Elementary School
Post-Bid
Less than $8,552,850 est. value
Pompano Beach, FL

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Smart Program Renovations Panther Run Elementary School
Results
Less than $947,715 est. value
Pembroke Pines, FL 33029

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Carrollton Boys School
New Construction - 66,602 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Miami, FL

Joella C. Good Elementary School Renovations
Renovation - 93,863 SF
Post-Bid
Less than $3,136,235 est. value
Hialeah, FL 33015

Brentwood Elementary School Covered Play Area And Multipurpose Room
Results
Pensacola, FL 32505

Witt Elementary School Renovation and Addition
Renovation, Addition
Construction
$17,000,000 est. value
Bradenton, FL 34212

Reported 04/09/2021 12:00 AM
Project Title

Burney Elementary School HVAC and Systems Upgrades Project

Physical Address View project details and contacts
City, State (County) Plant City, FL 33563   (Hillsborough County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work over summer break, including one-for-one Split A/C Systems and Wall-Mounted Package Units, as well as a new HVAC Management System, new Fire Alarm System and Phone/Intercom Upgrades. Additional scope of work includes daily/final cleaning, demolition, drywall patching, suspended/acoustical ceilings, paint patching, HVAC, parking lot patching in (3) locations of the north lot, vacuuming the storm system, sealcoating and restriping of same.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents