Similar Projects
Fy 21 Micro-Surfacing Package
Design
$500,000 to $1,000,000 est. value
Fort Hood, TX

2021 Street Overlay Project
Bidding
Belton, TX

Asphalt Overlay and Millings Services
Term Contract
Bidding
Killeen, TX

North 31st Street Improvements and Temple Independent School District Parking Lots
Post-Bid
Less than $8,530,000 est. value
Temple, TX 76504

Street Construction Materials and Services
Term Contract
Post-Bid
Killeen, TX 76541

Southern Region Disaster Recovery Support BPA
Results

Killeen Independent School District - ADA Improvements
Results
Killeen, TX 76543

Asphalt and Concrete Services, Supplies and Equipment
Post-Bid
$50,000 to $75,000 est. value
Belton, TX 76513

Widen From Two to Four Lane Divided Highway
Results
Less than $80,555,513 est. value
TX

North Clarke Road C Reconstruction
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Hood, TX

Warrior's Path Reconstruction, Phase I
Results
$2,850,000 est. value
Harker Heights, TX 76548

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Post-Bid
Nolanville, TX

Outer Loop North Phase I - Central Pointe Parkway to Mclane Parkway
Results
Less than $7,509,103 est. value
Temple, TX 76501

Base Failure Pavement Repair
Results
Less than $1,571,364 est. value
TX

Widen from Four to Six Lanes and Resurface
Results
Less than $40,032,907 est. value
TX

Last Updated 07/10/2020 08:29 AM
Project Title

Construct West to East Turnaround

Physical Address View project details and contacts
City, State (County) TX   (Bell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,110,819
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 33.000 1 110 6001 Excavation (Roadway) Cy 19.000 2 132 6026 Embankment (Final) (Dens Cont) (Ty c2) Cy 176.000 3 134 6001 Backfill (Ty a) Sta 24.400 4 160 6003 Furnishing And Placing Topsoil (4") Sy 5,689.000 5 162 6008 Roll Sodding Sy 5,689.000 6 164 6051 Drill Seed (Temp)(Warm Or Cool) Sy 5,689.000 7 168 6001 Vegetative Watering Mg 92.800 8 216 6001 Proof Rolling Hr 8.000 9 346 6002 Stone-Mtrx-Asph Sma-c Sac-a Pg76-22 Ton 1,558.000 10 400 6005 Cem Stabil Bkfl Cy 521.000 11 416 6001 Drill Shaft (18 In) Lf 187.000 12 416 6004 Drill Shaft (36 In) Lf 549.000 13 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 48.000 14 420 6014 Cl c Conc (Abut)(Hpc) Cy 89.500 15 420 6030 Cl c Conc (Cap)(Hpc) Cy 62.900 16 420 6038 Cl c Conc (Column)(Hpc) Cy 53.000 17 420 6040 Cl c Conc (Column)(Hpc)(Mass) Cy 42.000 18 420 6066 Cl c Conc (Rail Foundation) Cy 78.000 19 422 6002 Reinf Conc Slab (Hpc) Sf 14,348.000 20 422 6015 Approach Slab Cy 190.800 21 425 6039 Prestr Conc Girder (Tx54) Lf 1,776.470 22 432 6002 Riprap (Conc)(5 In) Cy 884.000 23 432 6045 Riprap (Mow Strip)(4 In) Cy 33.000 24 450 6023 Rail (Ty Sstr) Lf 1,332.000 25 450 6024 Rail (Ty Sstr)(Hpc) Lf 892.600 26 454 6018 Sealed Expansion Joint (4 In) (Sej - m) Lf 151.000 27 500 6001 Mobilization Ls 1.000 28 502 6001 Barricades, Signs And Traffic Handling Mo 16.000 29 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 61.000 30 506 6011 Rock Filter Dams (Remove) Lf 61.000 31 506 6021 Construction Exits (Install) (Ty 2) Sy 156.000 32 506 6024 Construction Exits (Remove) Sy 156.000 33 506 6038 Temp Sedmt Cont Fence (Install) Lf 2,175.000 34 506 6039 Temp Sedmt Cont Fence (Remove) Lf 2,175.000 35 512 6001 Port Ctb (Fur & Inst)(Sgl Slope)(Ty 1) Lf 1,560.000 36 512 6021 Port Ctb (Des Source)(Low Prof)(Ty 1) Lf 2,420.000 37 512 6022 Port Ctb (Des Source)(Low Prof)(Ty 2) Lf 40.000 38 512 6037 Port Ctb (Stkpl)(Sgl Slp)(Ty 1) Lf 1,560.000 39 512 6045 Port Ctb (Stkpl)(Low Prof)(Ty 1) Lf 1,936.000 40 512 6046 Port Ctb (Stkpl)(Low Prof)(Ty 2) Lf 40.000 41 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 484.000 42 529 6002 Conc Curb (Ty Ii) Lf 1,105.000 43 536 6002 Conc Median Sy 122.000 44 540 6002 Mtl w-Beam Gd Fen (Steel Post) Lf 850.000 45 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 2.000 46 540 6016 Downstream Anchor Terminal Section Ea 3.000 47 542 6001 Remove Metal Beam Guard Fence Lf 225.000 48 542 6003 Remove Downstream Anchor Terminal Ea 2.000 49 544 6001 Guardrail End Treatment (Install) Ea 1.000 50 544 6003 Guardrail End Treatment (Remove) Ea 1.000 51 545 6005 Crash Cush Atten (Remove) Ea 4.000 52 545 6014 Crash Cush Atten (Instl)(r)(n)(70) Ea 4.000 53 610 6009 Remove Rd Il Asm (Trans-Base) Ea 1.000 54 610 6104 In Rd Il (u/p) (Ty 1) (150w Eq) Led Ea 4.000 55 610 6214 In Rd Il (Ty Sa) 40t-8 (250w Eq) Led Ea 7.000 56 610 6215 In Rd Il (Ty Sa) 40t-8-8 (250w Eq) Led Ea 1.000 57 618 6023 Condt (Pvc) (Sch 40) (2") Lf 100.000 58 618 6029 Condt (Pvc) (Sch 40) (3") Lf 1,988.000 59 618 6049 Condt (Pvc) (Sch 80) (2") (Conc Encse) Lf 533.000 60 618 6056 Condt (Pvc) (Sch 80) (3") (Conc Encse) Lf 397.000 61 620 6003 Elec Condr (No.12) Bare Lf 460.000 62 620 6004 Elec Condr (No.12) Insulated Lf 920.000 63 620 6007 Elec Condr (No.8) Bare Lf 2,696.000 64 620 6008 Elec Condr (No.8) Insulated Lf 5,146.000 65 624 6001 Ground Box Ty a (122311) Ea 1.000 66 624 6002 Ground Box Ty a (122311)w/Apron Ea 6.000 67 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 3.000 68 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 1.000 69 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(t) Ea 3.000 70 644 6060 In Sm Rd Sn Sup&Am Tytwt(1)Ws(p) Ea 4.000 71 644 6065 In Bridge Mnt Clearance Sgn Assm(Ty s) Ea 2.000 72 644 6067 In Sm Rd Sn Sup&Am (Inst Sign Only) Ea 1.000 73 644 6076 Remove Sm Rd Sn Sup&Am Ea 6.000 74 644 6077 Remove Brdg Mnt Clearance Sign Assm Ea 2.000 75 644 6080 Relocate Sm Rd Sn Sup & Am Ty Temp Ea 6.000 76 658 6013 Instl Del Assm (d-Sw)Sz (Brf)Ctb Ea 11.000 77 658 6027 Instl Del Assm (d-Sy)Sz (Brf)Ctb (Bi) Ea 9.000 78 658 6028 Instl Del Assm (d-Sy)Sz (Brf)Gf1 Ea 9.000 79 658 6046 Instl Om Assm (Om-2x)(Wc)Gnd Ea 2.000 80 658 6050 Instl Om Assm (Om-2z)(Flx)Srf Ea 4.000 81 658 6066 Instl Del Assm (d-Sr)Sz 1(Brf)Gf2 Ea 9.000 82 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 546.000 83 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 2,182.000 84 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 358.000 85 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 2,188.000 86 662 6052 Wk Zn Pav Mrk Remov (Refl) Ty Ii-c-r Ea 54.000 87 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 140.000 88 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 200.000 89 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 2,452.000 90 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 357.000 91 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 170.000 92 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 599.000 93 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 3,227.000 94 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 3,634.000 95 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 9.000 96 668 6078 Prefab Pav Mrk Ty c (w) (Dbl Arrow) Ea 1.000 97 668 6080 Prefab Pav Mrk Ty c (w) (Uturn Arrow) Ea 3.000 98 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 9.000 99 668 6092 Prefab Pav Mrk Ty c (w) (36")(Yld Tri) Ea 4.000 100 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 176.000 101 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 5,274.000 102 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 458.000 103 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 6.000 104 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 4.000 105 684 6010 Trf Sig Cbl (Ty a)(12 Awg)(5 Condr) Lf 6,015.000 106 684 6017 Trf Sig Cbl (Ty a)(12 Awg)(12 Condr) Lf 3,010.000 107 690 6009 Removal Of Cables Lf 1.000 108 690 6038 Removal Of Control Cabinet(Grnd Mnt) Ea 1.000 109 690 6040 Install Of Control Cabinet(Grnd Mnt) Ea 1.000 110 730 6107 Full - Width Mowing Cyc 2.000 111 738 6001 Cleaning / Sweeping (Center Median) Cyc 16.000 112 738 6003 Cleaning / Sweeping (Outside Main Lane) Cyc 16.000 113 738 6005 Cleaning / Sweeping (Frontage Road) Cyc 6.000 114 3076 6001 d-Gr Hma Ty-b Pg64-22 Ton 3,693.000 115 3085 6001 Underseal Course Gal 3,541.000 116 6001 6001 Portable Changeable Message Sign Day 240.000 117 6001 6002 Portable Changeable Message Sign Ea 4.000 118 6155 6002 Radar Communication Cable Lf 2,805.000 119 6185 6002 Tma (Stationary) Day 240.000 120 6185 6003 Tma (Mobile Operation) Hr 360.000 121 6306 6007 Vivds Cabling Lf 85.000 122

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents