Similar Projects
Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Shores at Palmetto Bay
New Construction
Conception
Palmetto Bay, FL

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

Miami Riverside Center
New Construction - 6,000,000 SF
Design
$80,000,000 est. value
Miami, FL

PHCD Work-Order Contract 2021 - Central Area
Bidding
$2,175,000 est. value
Miami, FL 33125

Peters Plaza Elevator Replacement
Post-Bid
Less than $500,000 est. value
Miami, FL 33138

Quail Roost Park-New Playground Expansion and Surface Conversion
Post-Bid
Less than $592,000 est. value
Miami, FL 33157

Roby George Park Locker Room Improvements and Outdoor Picnic Tables and Benches for Mayor Roscoe Warren Park
Results
Homestead, FL 33030

Baseball Field Maintenance at Palmer Park
Results
South Miami, FL 33143

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

River Landing Shops and Residences
New Construction - 1,600,000 SF
Construction
$425,000,000 est. value
Hialeah, Miami, FL 33010

Kenect Miami - Tower II
New Construction - 663,742 SF
Conception
$10,000,000 CJ est. value
Miami, FL

7918 West Drive
New Construction - 99,078 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Bay Village, FL

Development of Property at Vizcaya Station
Post-Bid
Miami, FL 331281

Franjo Park Improvements Project
Results
Cutler Bay, FL 33189

Last Updated 03/29/2021 10:49 AM
Project Title

Five Park

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33139   (Miami-Dade County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground
Contracting Method
Project Status Construction Commenced second quarter 2020, Construction Completion Expected second quarter 2023
Bids Due View project details and contacts
Estimated Value $345,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Park/Playground, New Construction, 3 Acres, 1 Apartments/Condominiums, 40 Stories Above Grade, New Construction 410 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents