Similar Projects
AutoZone #1935 / Rutland
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Proctor, VT 05765

Sand Hill Road Assisted-Living Facility
New Construction, Infrastructure - 94,000 SF
Design
$23,000,000 CJ est. value
Castleton, VT 05735

Rutland City Main Street Park Project 2023
Infrastructure
Bidding
$350,000 CJ est. value
Rutland, VT 05701

Rutland Town NHG SGNL(59)
Infrastructure
Bidding
$625,000 CJ est. value
Rutland, VT 05701

Two Paving Projects
Infrastructure
Post-Bid
$200,000 CJ est. value
Goshen, VT 05733

Castleton
Infrastructure
Post-Bid
Castleton, VT 05777

New Public Safety Building - City of Rutland
New Construction, Infrastructure
Results
$5,462,000 CJ est. value
Rutland, VT 05701

GMNF FR10-10.4 Culvert Replacement
Infrastructure
Design
$500,000 CJ est. value
Mount Tabor, VT 05739

Rutland Creek Path Segment 3
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Rutland, VT 05701

Forest Road 10 Culvert Replacement Green Mountain National Forest
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Wallingford, VT 05773

Grove Street Culvert Replacement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Rutland, VT 05701

Hubbardton STP 0161 (32)
Infrastructure
Post-Bid
$375,000 CJ est. value
Hubbardton, VT 05735

Construction of The Killington Water Transmission Mains Contract 3B
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Killington, VT 05751

Robbins Street Sidewalk 2023
Infrastructure
Post-Bid
$200,000 CJ est. value
Rutland, VT 05701

East Center Street Concrete Sidewalk
Infrastructure
Post-Bid
$200,000 CJ est. value
Rutland, VT 05701

Last Updated 05/11/2023 07:25 PM
Project Title

Killington Vermont Water System Source, Pumping, Storage, and Transmission Main

Physical Address View project details and contacts
City, State (County) Killington, VT 05751   (Rutland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installation of new well pumps with appurtenances; new wellhouse and a new pump station with process, electrical, instrumentation, and HVAC components; .75 mg pre-cast/pre-stressed concrete water storage tank with appurtenant items including piping; water main, with appurtenances, and including required site work and access roads; Site work including grading, yard piping, access roads, headwalls, drainage, restoration, and other miscellaneous work and cleanup. The project locations are the following: Pump Station: 6216 US-4, Killington, VT 05751. Well Metering Houses: approximately 5465 US-4, Killington, VT 05751. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 1.88% Women Owned Sub-Contracting Goal: 3.66% Disadvantaged Owned Sub-Contracting Goal: 8% Contract term: Duration of Work County(ies): Washington Location: 6216 US-4, Killington, VT 05751

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents