Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

West 27th Street Reconstruction Project
Infrastructure
Post-Bid
$7,365,463 est. value
Cedar Falls, IA 50614

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

FY2021 Sidewalk and Trail Repair Program Zone 1
Infrastructure
Results
Waterloo, IA 50703

Facilities Management North Parking Lot - Phase 2
Infrastructure
Results
Cedar Falls, IA

Cyber Lane Extension
Infrastructure
Results
Cedar Falls, IA

2021 Public Sidewalk Repair and Infill
Infrastructure
Results
$190,958 est. value
Cedar Falls, IA

2021 CDBG Sidewalk Infill
Infrastructure
Results
$176,242 est. value
Cedar Falls, IA

2021 Permeable Alley
Infrastructure
Results
$107,175 est. value
Cedar Falls, IA

2021 Sidewalk Assessment
Infrastructure
Results
$62,813 est. value
Cedar Falls, IA

2021 Seal Coat
Infrastructure
Results
$143,728 est. value
Cedar Falls, IA

2021 CFU Patching
Infrastructure
Results
$288,409 est. value
Cedar Falls, IA

Black Hawk Co George Wyth Trail Repair
Infrastructure
Results
IA

Last Updated 05/24/2022 02:18 AM
Project Title

2022 Alley Reconstruction Project

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,008 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the reconstruction six (6) alleys, three (3) of which are concrete and three (3) of which are permeable alleys. Work shall include a combination of excavation and backfill of the alley areas; removal and replacement of driveway and sidewalk and of PCC curb & gutter; sub drain; placement of storage and filter aggregate; permeable interlocking clay brick paver installation, seeding, and concrete, asphalt or gravel driveway replacement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents