Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

The Hub
New Construction
Design
Allen, TX

2019 New Administration Building and Visual and Performing Arts Center
New Construction - 312,039 SF
Design
Less than $93,000,000 est. value
Cypress, TX 77429

Cinemark Hollywood Movies 20
Renovation - 4,445 SF
Post-Bid
$213,000 est. value
Pasadena, TX 77503

Memorial Auditorium West Wing Stabilization Project
Renovation
Post-Bid
Wichita Falls, TX 76301

Latino Cultural Center - Multiform Theater
Results
Dallas, TX 75204

Austin HQE Auditorium Renovation
Renovation
Results
Less than $34,841 est. value
Austin, TX 78752

The Muse Building Renovation
Renovation - 3,000 SF
Construction
Conroe, TX

Studio Movie Grill
New Construction - 39,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Fort Worth, TX 76123

Atari Hotel
New Construction
Pending Verification
Austin, TX

Kalita Humphreys Theater
Renovation
Pending Verification
Dallas, TX 75219

Auditorium Repair
Post-Bid
Goodrich, TX 77355

Major Renovation CIP Hogg Memorial Auditorium HTH HMA
Renovation
Results
$16,000,000 to $18,000,000 est. value
Austin, TX 78712

Cinemark Theater
Renovation - 7,406 SF
Construction
Plano, TX 75025

East Village
New Construction
Pending Verification
Austin, TX 78754

Last Updated 06/22/2021 08:37 AM
Project Title

Dishman Auditorium Renovation

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77705   (Jefferson County)
Category(s) Entertainment/Recreation
Sub-Category(s) Theaters/Auditoriums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $524,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 21.1% The Project involves a facility assessment of the Dishman Auditorium at the Dishman Art Museum Building in order to bring the auditorium to current code compliance (ADA/TAS and Building Code), replace the existing seating, flooring, repair and enhance all wall and ceiling systems such as the upgrade of the LED lighting system, IT/AV/Data systems and suspended linear HVAC diffusers of the auditorium. Additionally, this project includes work to address Zero Six recommended repairs (per report dated November 27, 2019) in the emergency exit staircase. This project has a limited time frame since the auditorium is used for academic and teaching purposes in addition to serving patrons at the art museum. Anticipated construction start will be mid-January 2021 with substantial completion targeted for mid-July 2021.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents