Similar Projects
Elycroft Avenue Road and Drainage Improvements
Post-Bid
Rockaway, NJ 07866

Parking Lot and Drainage Improvements at Lincoln Park Middle School
Post-Bid
$351,488 est. value
Lincoln Park, NJ 07035

Church Street Drainage Improvements
Results
$60,201 est. value
Boonton, NJ 07005

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Precast Concrete Culvert
Post-Bid
Morristown, NJ 07960

Greenview Area Pipe Replacement
Results
Pompton Plains, NJ 07444

Veterans Park Culvert Replacement
Post-Bid
Parsippany, NJ 07054

Drainage Improvements to Hibernia Avenue
Results
Rockaway, NJ 07866

John Street Drainage Improvements
Post-Bid
East Hanover, NJ 07936

Drainage, Curb and Sidewalk Improvements at Various Locations 2020 General Services Program
Results
Convent Station, NJ 07960

Reconstruction of Various Streets in Mount Tabor, Phase V
Post-Bid
Parsippany, NJ 07054

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

Millbrook Avenue Retaining Wall Project
Post-Bid
Randolph, NJ 07869

Replacement of Knox Hill Road Culvert at Fosterfields Living Historical Farm
Results
Morristown, NJ 07960

Parking Lot and Drainage Improvements at Lincoln Park Middle School A
Post-Bid
Lincoln Park, NJ 07035

Last Updated 05/10/2021 10:38 AM
Project Title

Rock Slope Scaling Schooley`s Mountain Road (Cr 517)

Physical Address View project details and contacts
City, State (County) Long Valley, NJ 07853   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rock Scaling shall consist of the removal of loose, hanging or potentially dangerous rock and soil by rock scaling methods on slopes as steep as vertical. Rock scaling includes the removal of trees along the face and crest of the slope. Contractor shall be responsible for traffic control, debris removal, busting/breaking up of boulders, and tree removal once fallen. The Contractor shall provide all materials, equipment, and labor to perform rock scaling. The slopes to be scaled will be brought to a safe, stable condition by excavation methods including removing all loose spalls and rocks not firmly embedded into the slope.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents