Similar Projects
Altura Estates
New Construction, Demolition
Conception
Silver Grove, KY 41076

New Patio Homes
New Construction
Conception
$9,000,000 est. value
Louisville, KY 40228

Memorial Point Mixed-Use Residential Community
New Construction
Design
$65,000,000 est. value
Southgate, KY 41071

Apartment Complex
New Construction
Design
Louisville, KY 40291

RFQ for On-site Homebuilders
Term Contract
Bidding
$135,000 to $190,850 est. value
Louisville, KY

NS - Development Project: 1530 Holman Street
Renovation
Bidding
Covington, KY 41011

Installation of Ten (10) Foundations - Ann Street Foundations Project #20-01
New Construction
Post-Bid
$300,000 est. value
Newport, KY 41071

Residential Sound Insulation Program
Renovation
Post-Bid
Louisville, KY 40209

Oakwood Cottages #103 & #108
Renovation - 14,200 SF
Results
$3,240,292 est. value
Somerset, KY

Fire Damage Repairs
Results
Fulton, KY

Old Heady Road Housing Development
New Construction
Conception
Louisville, KY 40200

Singe Family and Multi Family Housing Units
New Construction - 1,000 SF
Design
Less than $500,000 CJ est. value
Bowling Green, KY 42101

NS- Development Project: 1110 Locust Street
Renovation
Bidding
Covington, KY 41011

Development Proposal: 1716 Garrard Street
Renovation - 1,734 SF
Post-Bid
Covington, KY

Residential Development
New Construction
Conception
Winchester, KY 40391

Last Updated 04/22/2021 04:42 PM
Project Title

Mark Riddle Phase II High Priority AML

Physical Address View project details and contacts
City, State (County) KY   (Boyd County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $51,475
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Mark Riddle Phase II HP AMLRP site is located at 401 Fourmile Road in Boyd County, KY at coordinates N 38° 18' 49.58", W 82° 44' 5.88". The front foundation of the Riddle home is settling due to poor sub surface conditions. It has caused the walls, particularly in the front of the home to begin cracking on the outside (brick) and inside (drywall); also the front door is slightly out of square which is causing the door not to open and shut properly. Work has been done on/near this site previously by OSM (circa 2008) and AML (circa 2010 & circa 2019). To abate this problem, a series of 15" diameter holes will be drilled up to 25 feet deep on an incline to exposes voids beneath the footing at locations depicted and as determine by the ENGINEER. The holes & voids will be filled with non-formed and finished concrete. Due to the unknown volume of concrete required to fill the void(s), concrete orders will be three cubic yards ordered (one at a time) to eliminate the risk of large overages. Every reasonable effort should be made to use all concrete delivered within this scope of work; however, due to the nature of this effort, some excess concrete (3 cubic yards maximum) may be placed within the construction limits as directed by the ENGINEER. Formed and finish concrete is setup to repair in kind, any existing concrete disturbed due to normal construction activities. Earthwork is setup to waste the drill-tailing on site waste area. Roadway stone and dense grade are setup to create a temporary work platform & access. Filter fabric and bi axial geogrid is setup to place beneath the aggregate to enhance bearing capacity for equipment. The driveway is not to be disturbed and will not be used for access, except for one area (15-foot width) to cross into the front yard. Two on site waste areas are setup, and both have been previously disturbed. Residential seeding is setup to revegetate all disturbed areas.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents