Similar Projects
Last Updated | 04/22/2021 04:42 PM |
Project Title | Mark Riddle Phase II High Priority AML |
Physical Address | View project details and contacts |
City, State (County) | KY (Boyd County) |
Category(s) | Residential |
Sub-Category(s) | Single-Family Homes |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $51,475 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Mark Riddle Phase II HP AMLRP site is located at 401 Fourmile Road in Boyd County, KY at coordinates N 38° 18' 49.58", W 82° 44' 5.88". The front foundation of the Riddle home is settling due to poor sub surface conditions. It has caused the walls, particularly in the front of the home to begin cracking on the outside (brick) and inside (drywall); also the front door is slightly out of square which is causing the door not to open and shut properly. Work has been done on/near this site previously by OSM (circa 2008) and AML (circa 2010 & circa 2019). To abate this problem, a series of 15" diameter holes will be drilled up to 25 feet deep on an incline to exposes voids beneath the footing at locations depicted and as determine by the ENGINEER. The holes & voids will be filled with non-formed and finished concrete. Due to the unknown volume of concrete required to fill the void(s), concrete orders will be three cubic yards ordered (one at a time) to eliminate the risk of large overages. Every reasonable effort should be made to use all concrete delivered within this scope of work; however, due to the nature of this effort, some excess concrete (3 cubic yards maximum) may be placed within the construction limits as directed by the ENGINEER. Formed and finish concrete is setup to repair in kind, any existing concrete disturbed due to normal construction activities. Earthwork is setup to waste the drill-tailing on site waste area. Roadway stone and dense grade are setup to create a temporary work platform & access. Filter fabric and bi axial geogrid is setup to place beneath the aggregate to enhance bearing capacity for equipment. The driveway is not to be disturbed and will not be used for access, except for one area (15-foot width) to cross into the front yard. Two on site waste areas are setup, and both have been previously disturbed. Residential seeding is setup to revegetate all disturbed areas. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |