Similar Projects
Highway 99W Pedestrian Bridge - City of Sherwood
New Construction, Infrastructure
Conception
$11,500,000 est. value
Sherwood, OR 97140

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

Rock Creek Campus Barn Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Portland, OR 97229

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

OR8 at River Road Section
Infrastructure
Results
$500,000 to $1,000,000 est. value
OR

SE Cornelius Pass Road Improvement Project
Infrastructure
Results
$10,000,000 to $15,000,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Hall Boulevard / Pfaffle Street New Traffic Signal - City Of Tigard
Infrastructure
Conception
$950,000 CJ est. value
Tigard, OR 97223

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

RFP Construction Manager at Risk - CM/GC Services for Homeless Shelter
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Beaverton, OR 97005

Last Updated 12/05/2022 10:08 PM
Project Title

North Dakota Street: Fanno Creek Bridge

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,326,890 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : https://www.tigard-or.gov/home/showpublisheddocument/2799/637949397521970000 This project will replace the existing bridge with a new enough to accommodate pedestrians and cyclists (on both sides) along with vehicles.Environment regulations will require a new bridge to be significantly higher and longer than the current bridge. The project may also reduce flooding over the roadway. Project is included City of Tigard 2022-2023 CIP Page 222. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Construct a new single span bridge on the same alignment. Raise the vertical grade line to improve site distance approaching the railroad crossing. As of December 06, 2022, this project is currently in the FY 2021-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. ODOT - North Dakota Street: Fanno Creek Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents