Similar Projects
Centennial Water Park Lift Station - WW2307 - City of Pearland
Renovation
Conception
$300,000 est. value
Pearland, TX 77584

Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

Miller Ranch Road Regional Lift Station Rehabilitation
New Construction
Post-Bid
Pearland, TX 77584

Lift Station 1 and 4 Improvements
Results
Less than $161,000 est. value
TX

Rehabilitation Of Duncan Drive Lift Station
Renovation
Results
$180,000 est. value
Oyster Creek, TX

Lift Station No. 2 and Force Main
Infrastructure
Post-Bid
TX

Lift Station No. 3 Modifications
Renovation
Results
Houston, TX

HPW - Lift Station Renewal And Replacement
New Construction, Renovation
Results
$9,921,000 est. value
Houston, TX

Alvin ISD High School Lift Station
New Construction
Results
Alvin, TX

Lift Station No. 2
New Construction
Results
TX

Lift Station No.5
New Construction
Results
$706,000 est. value
Houston, TX

Stringfellow Unit - Lift Station Replacement
New Construction
Results
Rosharon, TX 77583

Shadow Creek Regional Lift Station Rehabilitation and Generator
Alteration
Results
$946,990 est. value
Pearland, TX 77584

Lift Station No. 1 and Offsite Utilities
New Construction
Results

North Water Plant Booster Pump Station
New Construction
Results
$1,400,000 est. value
TX

Reported 06/16/2022 05:20 PM
Project Title

Veterans 2 Regional Lift Station Capacity Expansion & Rehabilitation - WW2302 - City of Pearland

Physical Address View project details and contacts
City, State (County) Brookside Village, TX 77581   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $3,276,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and renovation of a civil project in Pearland, Texas. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project. This project will rehabilitate the aging regional lift station and will include rehabilitation of the wet well removing the T-Lock and replacing with Sewpercoat lining, provide temporary by-pass pumping, replace submersible pumps and guiderails, increase capacity to firm capacity of 9.2 MGD, replace piping, provide new City standard electrical control panel along with new electrical rack and new upgraded electrical service, SCADA, provide a new automatic transfer switch for permanent generator connection and natural gas generator. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of June 15, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents