Similar Projects
Elevate Navarre
New Construction
Conception
Navarre, FL 32566

The Bristal at Boca Raton
New Construction, Build-Out, Demolition - 331,605 SF
Conception
Boca Raton, FL 33432

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Mandarin Parc
New Construction - 209,760 SF
Design
Homestead, FL 33032

Routine and Emergency SVCS Pool of Prequalified Contractors
Infrastructure
Bidding
Miami Beach, FL

H. Spurgeon Cherry Pool Liner Replacement
Alteration
Bidding
$300,000 est. value
Gainesville, FL 32605

Lake Wire Apartments
New Construction - 1,360,112 SF
Sub-Bidding
Lakeland, FL 33815

770 Apartments
New Construction - 79,981 SF
Post-Bid
$3,000,000 est. value
Saint Petersburg, FL 33701

Generation at Venice
New Construction
Post-Bid
Venice, FL 34275

Swimming Pool Service and Repair
Term Contract
Results
Viera, FL 32940

Shenandoah Park Pool Renovation Project
Results
Less than $6,411,192 est. value
Miami, FL 33145

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Water Pointe
New Construction - 1,277,564 SF
Construction
$7,140,000 est. value
Jupiter, FL 33477

Westgate Village
New Construction
Pending Verification
Wesley Chapel, FL 28104

Kennedy Boulevard Apartments
New Construction, Renovation
Pending Verification
$2,500,000 est. value
Tampa, FL 33606

Last Updated 06/02/2022 07:23 AM
Project Title

Construction Manager at Risk Services (GMP) Southwest Recreation Aquatic Center

Physical Address View project details and contacts
City, State (County) Largo, FL   (Pinellas County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To rehabilitate the southwest recreation aquatic center due to exceeding its expected life cycle which has left the aquatic center in much less efficient layout to keep up with the demand of the facility and drastic repairs. This project is not limited to condensing the pump house and filter house into one room, remodeling of the administration and bath house to allow for an updated and efficient layout, repaving the parking lot, repairing the leaking 50-meter pool, and restoring the dive tower to original shape.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents