Similar Projects
Parking Garage
New Construction, Demolition
Conception
$18,000,000 est. value
Hartford, CT

North Crossing
New Construction - 260,000 SF
Design
$200,000,000 est. value
Hartford, CT

Fintech Village
New Construction
Design
$400,000,000 est. value
West Hartford, CT

North and South Parking Garages Phase 1 Repairs
Renovation
Bidding
$830,000 est. value
Storrs, CT

Parking Garage Repairs
Renovation
Post-Bid
Stamford, CT 06905

Repairs and Improvements at Crown Street Garage and Temple Street Garage
Post-Bid
New Haven, CT 06500

Town Hall Parking Garage Rehabilitation
Results
Greenwich, CT

Elevator Modernization at Badolato and Szczesny Parking Garages
Results
$600,000 est. value
New Britain, CT 06051

West Woods Place
New Construction - 26,000 SF
Construction
$9,000,000 est. value
Hamden, CT 06518

11 Crown Street
New Construction - 93,823 SF
Construction
$30,000,000 est. value
Meriden, CT 06450

Parking Garage
New Construction - 184,110 SF
Design
$10,000,000 CJ est. value
Bridgeport, CT 06604

Parking Garage Joint Repair
Renovation
Post-Bid
Willimantic, Windham, CT 06226

Stamford Parking Garage in the City of Stamford
New Construction
Results
$60,000,000 to $89,999,999 est. value
Stamford, CT

Wooster Square Apartments
New Construction - 6,000 SF
Construction
$2,300,000 est. value
New Haven, CT 06510

Warehouse Distribution Center
Renovation - 298,000 SF
Design
Orange, CT 06477

Last Updated 12/24/2019 10:34 AM
Project Title

Convention Center Garage, Loading Dock, Front Street North Garage and Plaza Renovations and Improvement

Physical Address View project details and contacts
City, State (County) Hartford, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,742,040
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The SBE goal is twenty-five (25) percent of the contract value, with twenty-five (25) percent of that amount (6.25 percent of the overall project) as the MBE goal. This project consists of renovations, repairs and replacement of concrete, pavers, waterproofing, traffic-bearing membrane, cove joints, caulking, expansion joints, stair railings, fencing, cable barriers, drainage piping and miscellaneous finishes including associated demolition. The project consists of renovations, repairs and routine maintenance of the following: A. Convention Center Garage and Loading Dock - Construction of the Convention Center and garage began in March 2002. The garage was substantially complete in November 2004 and opened with the Convention Center in June 2005. The section of garage located below the convention center and most of the loading dock, are constructed of cast in place structural concrete. The east end of the loading dock consists of a concrete slab supported on structural steel. The loading dock ramp and eight story garage located south of the loading dock are constructed of precast concrete. B. The Front Street North Garage - Construction of the Front Street North Garage began in October 2004 and in opened in December 2006. This garage is constructed mostly of precast concrete. The exterior stair and adjacent planters and stepped seating area located above the west entrance are constructed of cast in place concrete supported on structural steel. The plaza located north of the exterior stair and slopped seating area consist of 1 1/2" pavers on a topping slab with snow-melt piping supported on cast in place concrete on structural steel to the south and on pre-cast tees to the north. The building is abutted to the north by the Travelers office building and to the south and west by the Front Street retail and residential development.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents