Similar Projects
Kitchen Vent Hood Inspection and Cleaning
Post-Bid
Sandy, UT 84093

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

HVAC Equipment for Portable Classrooms
Results
Less than $50,000 est. value
Salt Lake City, UT 84115

Electric Heat Pump Water Heater
Term Contract
Post-Bid
Salt Lake City, UT

Air Sanitation System for Air Handlers
Results
South Jordan, UT 84095

Hydraulic Test Stand Chiller
Post-Bid
Salt Lake City, UT 84116

DFCM Construction - Pre-Qualified General - DOH Cannon Health BAS Chiller Upgrade
Results
Less than $1,239,552 est. value
Salt Lake City, UT

J041--660 - (S4) Emergent Air Handler Repair Bldg 2 Ahu Repairs
Post-Bid
Salt Lake City, UT 84148

Radiology Lab Chiller Replacement
Results
Less than $400,000 est. value
Salt Lake City, UT 84112

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

Woodstock Elementary, VAV Reheat Boxes
Results
Less than $50,000 est. value
Murray, UT 84121

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Reported 02/26/2022 12:00 AM
Project Title

BEH S 025 AHU 1 System Upgrade

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84112   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $190,217
Plans Available from Mechanical Engineer - 02/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project consists of Basement HVAC System improvement is as follows: Replace existing 2 pneumatically controlled VAV terminal units with re-heat coils with new Direct Digital Control (DDC) controlled single duct Variable Air Volume (VAV) terminal units with reheat coils, control module, and reheat hot water control valve. • Revise existing ductwork as necessary for the installation of the new VAV terminal units. • Replace pneumatically controlled space temperature sensor with new DDC temperature sensor wall mounted at ADA height for spaces with an expected occupancy of 5 people or less. For all other spaces, replace pneumatically controlled space temperature sensor with new DDC combined temperature and CO2 sensor at ADA height. • Replace the existing outside air, return air, and relief dampers with new dampers and automatic DDC actuators. • Provide new outside airflow stations in both the minimum outside air and economizer duct sections. • Replace the existing AHU DDC control panel to incorporate the new control devices. • Install a 2-way automatic temperature control valve at the AHU chilled water piping. • Revise AHU sequence of operation to meet ASHRAE Guideline 36-2018 trim and respond control based on VAV terminal unit input. • Install VFD drives on the building chilled water pumps. • Install VFD drives on building heating water pumps. • Provide all-new control panels and control devices for new equipment necessary for a fully integrated DDC system that can report back to the campus BAS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents