Similar Projects
Savannah Harbor - Infrastructure - Phase I
New Construction
Conception
$130,000,000 est. value
Savannah, GA 31421

Twin Pines Minerals
New Construction
Conception
Folkston, GA 31537

Site Repair Thompson Stadium
Bidding
Macon, GA

Runway 35 RPZ Clearing, Minor Grading and Fencing
Bidding
Valdosta, GA 31601

Winder Retail Center - Site
New Construction
Sub-Bidding
Winder, GA

RCPS Central Office Complex Site and Roof
Post-Bid
Conyers, GA

Building Demolition and Site Improvements at William Hubbard School
Demolition
Post-Bid
Forsyth, GA 31029

Walking Trail at Meridian Park
Results
Loganville, GA 30655

General Contractor Site Clearing and Grading for New Athletic Field Saddle Ridge Elementary and Middle School
Results
Less than $1,118,000 est. value
Rock Spring, GA 30739

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

CVS #4190
Construction
Toccoa, GA 30577

Crowning of High School Football Practice Field
Bidding
Monticello, GA 31064

Terminal Area Site Improvements - Phase 2
Post-Bid
Dawson, GA 39842

Jeff Davis County BOE Site Work
Results
Hazlehurst, GA

CVS #5704
Renovation
Construction
Athens, GA 30606

Last Updated 12/03/2020 08:52 AM
Project Title

Kipp Vision Modular Health Clinic

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30315   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Construction Commenced July 2020, Construction Complete as of November 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Re-route existing storm sewer such that it does not run under proposed modular building. Exact location of new storm sewer to be determined. 2. Relocate existing light pole to new location as shown per plans. Cap off any unused electrical wires if/as needed. 3. Existing grade to be modified at proposed site of new modular building. 4. Remove any existing trees & landscaping if/as necessary to accommodate installation of new modular building at proposed site. 5. Provide new water quality feature as required by the City of Atlanta. Exact location of new water quality structure to be determined. 6. Provide electrical service hook-up including feeders extending from existing electrical lines at surrounding buildings on property to proposed location of new modular building. 7. Provide and install new accessible ramp, stair(s), and general access to the building per ADA standards. If damage occurs, GC shall patch & repair any existing sidewalk and asphalt paving if/as required. 8. Provide water and sewer connections to site of proposed new modular building. Tie into existing water supply & sewage lines at existing adjacent buildings on property. Verify exact location of existing lines in the field. 9. Install pre-engineered modular building per manufacturer's installation criteria.

Details

1 Site Development, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 13 - Special Construction.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents