Similar Projects
Reported | 02/08/2020 12:00 AM |
Project Title | Warehouse Racking Hardware, Installation And Remedial Services |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: AL, AZ, CO, CT, DC, DE, FL, GA, KY, MA, MD, ME, MI, NC, NH, NJ, NM, NY, OH, PA, PR, RI, SC, TN, TX, UT, VA, VI, VT, WV |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $100,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This exercise is a query into locating sources that could provide a complete turnkey solution, to include providing the necessary materials through commercial procurement or via GFE, the installation of new racking and storage configurations, retrofitting/upgrading/repairing existing racking and storage configurations, and demolition and removal of existing storage configurations. Racking will be of the following types and any combination thereof: pallet rack, cantilever rack, package rack, bin rack, pallet and case flow rack, pallet flow rack, push back rack, and sheet metal cassette storage rack. If the racking material is not required to be a mandatory purchase from FPI, the Government would prefer all bin, package and pallet rack to be compatible with the existing FPI oversize tear drop design if possible so that all existing FPI components are interchangeable with existing FPI GFE bin, package and pallet racks. Sizes of package, bin and pallet rack requested are 24, 30, 36 and 40 inches deep and between 6 ft. to 35 ft. high. The contractor shall also have the capability of providing in-rack sprinkler system and fire alarm systems, rack capacity studies, floor capacity engineering studies, rack netting, bin boxes, bin dividers, rack repair and shall capable of rack demolition/relocation of rack systems to other DLA Distribution Sites. Heights of pallet flow rack shall be up to 4 levels high with 52 in. locations. The contractor shall supply all supervision/management, personnel, material, supplies, equipment, and tools necessary to the storage aid upgrade. All equipment supplied under the contract shall be supplied, installed and shall include transportation to the work site. All systems shall include an engineering study with structural calculations, rack capacity designed for the seismic zone per each installation location and rack capacity signage at the ends of each rack aisle. The installations shall be turnkey complete and usable systems which comply with all NFPA, RMI and UFC Standards. The current rack utilized is a combination of wide aisles (no guidance) and Very Narrow Aisle –VNA (wire guidance or rail guidance). The vehicles shall not be procured by the rack manufacturer but the racking contractor shall install (or replace) the wire or rail for compatibility with the government furnished vehicles. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |