Similar Projects
New Crestline Elementary School
New Construction
Bidding
Hartselle, AL 35640

Contractor - New Elkmont Elementary School
New Construction
Bidding
$24,000,000 est. value
Elkmont, AL 35620

Renovation of Breakthrough Charter School
Renovation
Post-Bid
Marion, AL 36756

Improvements to Various Schools for the Eufaula City Schools
Post-Bid
Eufaula, AL

Renovations for Stem Lab at Evans Elementary School
Renovation
Results
Less than $450,000 est. value
Albertville, AL

Spanish Fort Elementary School
New Construction, Renovation - 143,000 SF
Results
$28,549,000 est. value
Spanish Fort, AL 36527

New Elementary School, Stonebridge Elementary
New Construction - 132,000 SF
Construction
$21,379,000 est. value
Loxley, Spanish Fort, AL

Farmville Road Elementary School
New Construction - 73,000 SF
Construction
$17,729,000 est. value
Auburn, AL

Classroom Renovations at A.H. Watwood Elementary School
Renovation - 14,500 SF
Bidding
$300,000 est. value
Childersburg, AL 35044

Platform Lift for Robinson Elementary School
Renovation
Post-Bid
Fairfield, AL

Selective Demolition For Centre Elementary School
Results
Less than $35,569,000 est. value
Centre, AL 35960

Improvements to Hokes Bluff Elementary School
Construction
Gadsden, AL

Toilet Renovations at Southside High School, Southside Primary School and Dallas County Career Center
Renovation
Bidding
$400,000 est. value
Selma, AL

Portable Classrooms at Legacy Prep School
New Construction
Post-Bid
Birmingham, AL

Mountain Brook Elementary Schools 2021 Renovations
Renovation
Results
Mountain Brook, AL 35223

Last Updated 06/14/2022 11:34 AM
Project Title

Bluff Park Elementary School Addition

Physical Address View project details and contacts
City, State (County) Hoover, AL 35226   (Jefferson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new 1-story, 10 classroom addition to the existing Bluff Park Elementary School located at 569 Park Avenue. The project received conditional use approval from the Hoover Planning and Zoning Commission on May 9, 2022. An architect has been selected. Information regarding a timeline for bid/ construction has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.Total sq ft for project not available at this time.

Details

Elementary School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents