Similar Projects
HVAC Preventative Maintenance Service
Term Contract
Bidding
Dallas, El Paso, Houston, San Antonio, TX 75243

Air Cooled Chiller for FMC Carswell
Term Contract
Bidding
Fort Worth, TX 76127

Purchase of Gearbox for Port San Antonio Cooling Tower
Post-Bid
San Antonio, TX 78212

HVAC Disposable Air Filters for San Antonio Airport System
Post-Bid
San Antonio, TX 78283

Maintenance Building Rooftop Air Heater Replacement
Results
Less than $790,000 est. value
San Antonio, TX 78212

North Thermal Energy Plant (NTEP) Chiller No. 3 Replacement
Results
Less than $1,968,000 est. value
San Antonio, TX

HVAC Cleaning - JBSA RAN Bldg 693
Post-Bid
Universal City, TX 78150

Closed Circuit Cooling Tower Replacement
Results
San Antonio, TX

Air Handling Units Replacement
Post-Bid
San Antonio, TX 78221

Specialized Air Conditioning Maintenance and Repair for IT Spaces (ITSD)
Results
Less than $228,700 est. value
San Antonio, TX 78200

A/C for Central Utility Plant Preventive Maintenance and Repairs
Post-Bid
San Antonio, TX 78216

Chimney, Vent, and Duct Cleaning Services Agency Wide
Results
Less than $262,000 est. value
San Antonio, TX 78204

HVAC Repair Multiple-Award Blanket Purchase Agreement
Post-Bid
San Antonio, TX

Chiller Maintenance and Compressor Replacement
Results
San Antonio, TX

HVAC Maintenance Contract
Post-Bid
San Antonio, TX 78230

Reported 09/14/2021 12:00 AM
Project Title

Condenser Water Filtration System Upgrade

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78226   (Bexar County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade the existing condenser water filtration, controls and piping system at the DISA facility in San Antonio, TX, to improve reliability, energy use, and redundancy in order to meet DOD standards. The contractor is required to enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing and adjust the water filtration controls. This Capital Equipment project is working on the IT only mechanical system and is separate from the building mechanical system.

Details

Division 22 - Plumbing, Common Work Results for Plumbing, Domestic Water Filtration Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents