Similar Projects
Air Force Targeting Center
New Construction - 94,800 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Hampton, VA

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

Construct Hangar E And F Site Work
New Construction - 28,000 SF
Results
Less than $549,940 est. value
Weyers Cave, VA

Sidewalk Repair
Term Contract
Results

Roanoke Readiness Center/Virginia National Guard Readiness Center
Renovation - 24,347 SF
Post-Bid
$7,483,000 est. value
Troutville, VA 24175

9th Street Sidewalk Improvements
Results
Richmond, VA

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Bus Loop Concrete Sidewalk Extension at Evergreen ES and OB Gates ES
Infrastructure
Results
Chesterfield, Midlothian, VA 23114

General Building Trade Contract
Renovation, Term Contract
Post-Bid
Stafford, VA

Gloucester Courthouse Pedestrian Facility - TAP
Infrastructure
Results
Gloucester, VA 23061

On Call ADA Compliance - VSBEP
Infrastructure
Results
$1,000,000 est. value
VA

Sheriff Station Parking Lot Resurfacing
Infrastructure
Results
Bedford, VA 24523

Last Updated 04/21/2022 04:40 PM
Project Title

BAAF Operations Building and Parking Lot

Physical Address View project details and contacts
City, State (County) Blackstone, VA   (Nottoway County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at Blackstone Army Air Field in Blackstone, Virginia. Work includes a new 5,280 square foot pre-engineered metal building to serve as an airfield office and welcome center. Spaces include administrative spaces, a waiting area/lounge, and support spaces. Site work includes site grading with associated erosion & sediment control, concrete paving, stormwater management facilities, water, sanitary piping with a pump station, propane gas and power infrastructure. Heating and cooling will be provided by four dedicated DX split system heat pumps serving each of the occupied spaces. Ductless DX mini-split heat pump systems will serve the telecom and mechanical rooms. Electric unit heaters will provide heat only to the unoccupied spaces as well as the restrooms. Exhaust fans will remove exhausted air from the restrooms. The building will be provided with a complete building power distribution system equipped with LED lighting, a fire alarm system and a building wide telecommunications system.

Details

Military Facility, Approximately 5,280 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents